Projects
2023
# | Client | Owner | Project Description | Qty | Start Date | Completion Date |
---|---|---|---|---|---|---|
1 | Motas Group BV | Motas Group BV | Fabrication Works, Surface Treatment and Delivery Ex-Works KESB Jetty, Telok Panglima Garang for 1 unit 180' x 70' x 11' Barge for Spreader Pontoon & BV Hull Attestation | 390 T | 24/1/2023 | 30/6/2023 |
2 | JML Maintenance Sdn Bhd | JML Maintenance Sdn Bhd | Supply, Fabricate, Blast & Paint (where required) and Delivery Ex-Works Vantage Stell Works Sdn Bhd of MSG Furnace Steel Works | 87 T | 23/2/2023 | 24/6/2023 |
3 | Motas Group BV | Motas Group BV | Oufittings for Spreader Pontoon-H013 Project | 72 T | 30/3/2023 | 31/7/2023 |
4 | Whessoe Sdn Bhd | Whessoe Sdn Bhd | Supply Labour & Consumables, Fabrication & Testing, Delivery FCA Workshop - Spillway LLO Radial Gate Arm Boxed Section | 29 T | 2/5/2023 | 1/12/2023 |
5 | Koniambo Nickel SAS | Koniambo Nickel SAS | Water Cooled Roof Panels, Explosion Door & Miscellaneous items | 70 T | 8/6/2023 | 28/12/2023 |
6 | Lisge Southeast Asia Sdn. Bhd. | Lisge Southeast Asia Sdn. Bhd. | Secondary Steel Supports (BL21 Package) for Project at Nhon Trach Unit 3 & 4 at Vietnam | 120 T | 30/5/2023 | 22/8/2023 |
7 | General Electric Global Services GMBH, Deutscland | General Electric Global Services GMBH, Deutscland | ER22 Machine Foundation Embedment for Project Altbach | 48 T | 22/5/2023 | 18/8/2023 |
8 | General Electric Global Services GMBH, Deutscland | General Electric Global Services GMBH, Deutscland | ER22 Machine Foundation Embedment for Project Heilbronn | 48 T | 22/5/2023 | 15/9/2023 |
9 | Koniambo Nickel SAS | Koniambo Nickel SAS | Supply Material, Manufacturing, Castable Refactory Works, Surface Treatment & Coating, Trial Assembly and Delivery FOB, Port Klang for Water Cooled Roof Panels & Misc. Items | 70 T | 6/7/2023 | 15/5/2024 |
10 | Top-Mech Provincial Sdn Bhd | Top-Mech Provincial Sdn Bhd | Supply, Fabrication, Inspection & Testing, Surface Treatment & Painting, Delivery FCA-Bukit Kemuning for Monorail Beam | 103 T | 30/6/2023 | 20/9/2023 |
11 | Andritz Sdn Bhd | Andritz Sdn Bhd | Variation Order for Supply &Fabrication for Additional Embedded Parts & Special Items Excluded from Original PO - Turbine Parts | 2 Lot | 1/9/2023 | 15/2/2024 |
12 | Motas Group BV | Motas Group BV | Supply Material, Manufacturing, Surface Treatment, Testing & Delivery FCA Kemuning Engineering Sdn Bhd for RFQ Part THSD Fairway - Overflow Parts | 52 T | 4/10/2023 | 27/12/2023 |
13 | BCI LTD, Hong Kong | BCI LTD, Hong Kong | Tipping & Drive Station of Induration Machine & Spherical Bearing | 76 T | 13/11/2023 | 15/6/2024 |
2022
# | Client | Owner | Project Description | Qty | Start Date | Completion Date |
---|---|---|---|---|---|---|
1 | Van Oord Ship Management B.V. | Van Oord Ship Management B.V. | Supply Material, Manpower, Tools and Equipment to Fabricate Deck Construction for Long Suction Pipe ZSH 7.0 | 102 T | 24/2/2022 | 25/7/2022 |
2 | CH Yodoform Sdn. Bhd. | VCH Yodoform Sdn. Bhd. | Fabricate of Steel Structures for Pipe Rack Zone-2 for Nine Dragon Paper Mill, Banting Project | 428 T | 27/4/2022 | 25/7/2022 |
3 | Equator Engineering Sdn. Bhd. | Equator Engineering Sdn. Bhd. | Supply Material for 1 Unit of ST Machine -Anchor Box & Embedded Plate | 12 T | 18/5/2022 | 30/6/2022 |
4 | ISHI Power Sdn Bhd | ISHI Power Sdn Bhd | Supply, Fabricate and Delivery DAP Jimah Site for Stainless Steel 304 Protector For Tube Of Boiler, JEP Project Spare Part | 6420 Pcs | 1/7/2022 | 1/3/2023 |
5 | Andritz Sdn Bhd | Andritz Sdn Bhd | Supply, Fabrication, Testing, Surface Treatment & Coating, Delivery Ex-Work - Draft Tube Liner, DT Cone, Pit Liner, Embedment Parts | 340 T | 22/9/2022 | 3/4/2023 |
6 | Koniambo Nickel SAS | Koniambo Nickel SAS | Water Cooled Roof Panels, Explosion Door & Miscellaneous items | 70 T | 3/10/2022 | 28/2/2023 |
7 | Samsung C&T | Samsung C&T | To Supply HRSG - Embedment Anchor Bolts - Vietnam Nhon Trach 3,4 | 60 T | 26/9/2022 | 15/10/2023 |
8 | JGC Asia Pacific (M) Sdn Bhd | JGC Asia Pacific (M) Sdn Bhd | To Supply, Fabrication, Inspection and Testing, Surface Treatment and Coating, Delivery DDP Kulim Kedah | 205 T | 25/10/2022 | 30/6/2023 |
9 | JML Maintenance Sdn Bhd | JML Maintenance Sdn Bhd | Fabrication of Bath & Coater Steel Modification Works Package | 133 T | 29/12/2022 | 30/6/2023 |
2021
# | Client | Project Description | Quantity |
---|---|---|---|
Jun 2021 | IHI Corporation | Supply, Fabrication, Hot Dipped Galvanized and Delivery FOB Cable Tray Support for U1 & U2 for Matarbari Project | 126 T |
Nov 2022 | General Electric International Inc. (Taiwan) | HSINTA CCPP (Unit 1-3) GR22 - GT and Generator Foundation Embedment | 113 T |
Nov 2021 | Koniambo Nickel SAS | Water Cooled Roof Panels, Explosion Door & Miscellaneous items | 76 T |
Jan 2023 | General Electric International Inc. (Taiwan) | HSINTA CCPP (Unit 1-3) SR22 - ST and Generator Foundation Embedment | 47 T |
Dec 2022 | General Electric International Inc. (Taiwan) | Supply Material, Consumable, Equipment & Tools, Machining, Worker, Surface Treatment, Packing, FOT (MTM Ulu Klang) for Transformer 30MVA-203 | 76 T |
2020
# | Client | Project Description | Quantity |
---|---|---|---|
March 2020 | IHI Corporation | Supply and Fabrication Coal Bunker (10 Sets) including Shop dwg, Fabrication, Consumable, Testing, Blasting & Painting and Packing and Delivery FCA for Matarbari 2 x600 Coal Fired Power Plant Unit 1 and Unit 2 | 1057 T |
Feb 2020 | BCI LTD, Hong Kong | Supply, Manufacturing, Surface Treatments, Partial Trial Assembly, and Delivery FOB Port Klang for Tipping Wheel, Drive Wheel (Include torque tube and dust pans), Main Drive Base and Guide Rails 1020C - RUNGTA I | 72.6 T |
Feb 2020 | BCI LTD, Hong Kong | Supply, Manufacturing, Surface Treatments, Partial Trial Assembly, and Delivery FOB Port Klang for Tipping Wheel, Drive Wheel (Include torque tube and dust pans), Main Drive Base and Guide Rails 1020C - RUNGTA II | 72 T |
Feb 2020 | Kemuning Structures Sdn Bhd | Supply of 99 Units CV Cabin Structural Steel. Est. weight:2,550 kg/unit | 252 T |
Feb 2020 | Malaysia Transformer Manufacturing S/B | Supply Material, Consumable, Equipment & Tools, Machining, Worker, Surface Treatment, Packing, FOT (MTM Ulu Klang) for Transformer 30MVA-203 | 14 Unit |
March 2020 | Jiwa Kental Sdn Bhd | To Supply material, Fabrication, Surface Treatment & Coating, Delivery Free on Truck Site, Port Klang & Erection Work for ILB Building & Misc. Structural | 95 T |
October 2020 | IHI Corporation | Fabrication and Supply of hanging Scaffolding for inside furnace of boiler Unit 1 & Unit 2 in Matarbari Project | 317 T |
November 2020 | BCI LTD, Hong Kong | Supply, Manufacturing, Surface Treatments, Partial Trial Assembly, and Delivery FCA, Bukit Kemuning for Tipping Wheel, Drive Wheel (Include torque tube and dust pans), Main Drive Base and Guide Rails | 30 T |
2019
# | Client | Project Description | Quantity |
---|---|---|---|
March 2019 | GE Power Solutions (Malaysia) Sdn Bhd | Supply Track 4A GT/ST and Generator Platform and E-Rooms Platform for ER22 Project Unit 1 & Unit 2 | 89.6 T |
March 2019 | Van Oord Ship Management B.V | Supply Material,Manufacturing, Surface Treatment, Testing and delivery DAP Keppel shipyard Singapore for Bottom Doors/Stems/Wedges/Plates | 196.25 T |
March 2019 | GEPower (Switzerland) GMBH | Supply EB05X Prefabrication of Structural Steel Works For Dump Condenser Module(DCM) For Bintulu Tanjung Kidurong 2 CCPP | 95 T |
May 2019 | BCI LTD, Hong Kong | Supply,Manufacturing,Surface Treatment and Delivery at Ex- Workshop for Tipping Wheel, Drive Wheel and Guide Rail. (PROJECT NO.:1011C) | 61.679 T |
May 2019 | Malaysia Transformer Manufacturing S/B | Supply and Fabricate Complete Tank 30MVA-203 - 20 units | 20 Unit |
July 2019 | Koniambo Nickel SAS | To Supply, Fabrication, Testing, Painting, FOB Port Klang - Water Roof Panels x 6 Panels (CCEFGH) | 23.75 T |
July 2019 | Van Oord Ship Management B.V | To Supply Trunion Gantry, Intermediate Gantry and Draghead Gantry | 330 T |
October 2019 | Van Oord Ship Management B.V | Supply material,manpower,tools and equipment for bow coupling tower for 2 vesselsg | 108 T |
November 2019 | Van Oord Ship Management B.V | To Supply Material, Manufacturing, Surface Treatment, Testing and Delivery DAP Keppel Singmarine Singapore for Bottom doors/Main stems/Lower stems/Wedges | 98.38 T |
December 2019 | ISHI Power Sdn Bhd | Supply, Fabrication and Delivery of Protector for Reheater Vertical Tubes Unit 1 for JEP Project, Negeri Sembilan | 65 T |
December 2019 | ISHI Power Sdn Bhd | Supply, Fabrication and Delivery of Protector for Reheater Vertical Tubes Unit 2 for JEP Project, Negeri Sembilan | 65 T |
2018
# | Client | Project Description | Quantity |
---|---|---|---|
January 2018 | ISHI Power Sdn Bhd | Modification works for Mill Monorail Beams for Jimah East Power 2x1000mW Coal Fired Power plant Project Unit 1 & Unit 2, Malaysia | 255 T |
January 2018 | Yamashita Seisakusho Co. Ltd. | Additional Pipe Support Accessories and Secondary Structural Steel for Unit 2 for Jimah East Power 2x1000mw Coal Fired Power Plant Project, Malaysia | 95 T |
May 2018 | Sinohydro Corporation Ltd | Steel Structural Work for Part of Balance of Plant Subcontract for 400MW Combined Cycle Generating Power Plant Project at Bintulu Tanjung Kidurong (Unit 1 & 2) | 209.4 T |
May 2018 | KROHNE (M) Sdn Bhd | Fabrication Piping & Structure Work, Inspection & Testing, Blasting & Painting, and Delivery Ex-Workshop, Bukit Kemuning of SV Gas Export Metering Skid and TU Gas Metering Skid for Sao Vang (SV) Central Processing Platform, Sao Vang and Dai Nguyet Development Project. | 2 Units (1506 DI) |
May 2018 | GE Power Solutions (Malaysia) Sdn Bhd | Supply Track 4A GT/ST and Generator Platform for ER22 Project | 172 T |
August 2018 | General Electric (Switzerland) GMBH | Supply Prefabrication of Stuctural Steel Works for Dump Condenser Module (DCM) For Bintulu Tanjung Kidurong CCPP Project | 87 T |
August 2018 | Sinohydro Corporation (M) Sdn Bhd | Supply and fabricate Steel Structural works for Gas Turbine Hall (Uni12,unit 13) For Project at Bintulu Tanjung Kidurong | 729 T |
August 2018 | Sinohydro Corporation (M) Sdn Bhd | Supply and fabricate Secondary Steel Structural works for Gas Turbine Hall (Uni12,unit 13) For Project at Bintulu Tanjung Kidurong | 111 T |
August 2018 | Baars Confloat B. V. | To Supply, Fabrication, Surface Treatment & FOB for 9.5 Jack Up Platform | |
September 2018 | JGC Malaysia Sdn Bhd | Supply & shop fabricated structure for New MRU Project Train 9 | 130 T |
December 2018 | Terex Malaysia Sdn Bhd | Supply of Steel Material, Tools & Equipment, Consumable, Skill Labour to Fabricate and Deliver, Ex-Workshop for MHS 6203 x 7 units | 79 T |
December 2018 | Terex Malaysia Sdn Bhd | Supply of Steel Material, Tools & Equipment, Consumable, Skill Labour to Fabricate and Deliver, Ex-Workshop for MHS 8203 x 6 units | 12.6 T |
2017
# | Client | Project Description | Quantity |
---|---|---|---|
December 2017 | Dialog Plant Services Sdn Bhd | Engineering Supply, Testing, Inspection and Delivery of Nitrogen Gas Receiver (Petrochemical), Launcher / Receiver and Knockout Drum for EPCC of Pengerang Deepwater Petroleum Terminal 2, Pengerang, Johor, Malaysia | 66 T |
December 2017 | Platinum Railway Engineering Services Sdn Bhd | Supply and Fabrication for Standard Bracket (28,353 sets) for MRT2 Sg Buloh-Serdang-Putrajaya (SSP) Project, Malaysia. | 403 T |
October 2017 | Sinohydro Corporation Ltd | Supply, Fabrication & Erection of Steel Structure for Bintulu Tanjung Kidurong Combined Cycle Power Plant Project (Unit 10 & Unit 11), Sarawak, Malaysia | 486 T |
October 2017 | Yamashita Seisakusho Co. Ltd. | Supply and Fabrication for Pipe Support Accessories & Secondary Structural Steel for Jimah East Power 2x1000mW Coal Fired Power plant Project Unit 1 & Unit 2, Malaysia | 106 T |
September 2017 | Terex Malaysia Sdn Bhd | To Supply fabrication, surface treatment & coating and delivery to Subnag Jaya for MJ47 w 24" Feeder Jaw Module Structure Base Frame & Miscellaneous Parts (Est. Weight 43.81 MT) | 43.8 T |
September 2017 | Terex Malaysia Sdn Bhd | To supply raw material, tool and equipment, consumable, fabrication, inspection, surface treatment/galvanizing for terex modules MHS 8203 x 1 unit | 13.4 T |
August 2017 | Trelleborg Singapore Pte Ltd | Supply Steel Flange 2 OD1046 ID9991 T76 PR No:048541, Steel Flange od1402 ID1143 T76 PR No:048541 | |
August 2017 | Teras Teknologi Sdn Bhd | Manufacturing and installation Design and professional engineer endorsement of 1 unit Full VMS Gantry at Ampar Tenang,KM35 North-South Expressway Central Link (ELITE) | 8 T |
August 2017 | Terex Malaysia Sdn Bhd | Assembly MHS 6203 base c/w bolt kit | 12 T |
July 2017 | Sarens JWS (M) Sdn Bhd | To Supply 16.435 Meter Skidding Beam and 7.265 Meter Skidding Beam | 31 T |
July 2017 | ISHI Power Sdn Bhd | Supply Fabrication and Delivery of 2 Unit Miscellaneous Piping | 889 T |
June 2017 | Asian Offshore Services Sdn Bhd | Supply Tarpon LER Wood Group Module 5.9T,Module B 6.1T,Roof x 2nos 5.0T,Access Platform 1.5T, Cage Ladder 3.2T and Cable Ladder | 21.7 T |
June 2017 | Terex Pegson Limited | To Supply Raw Material, Tool & Equipment, Consumble, Skill Labour to Fabricate & Surface Treatment/Galvanizing for Terex MJ42-72A-1#01 Structure Steel (Revision 1) | 10.5 T |
March 2017 | Tai Crest Resources Sdn Bhd | TCR-020-17 Fuel Gas Skid,Instrumentation Fabrication, Pilot Burner | |
March 2017 | Howden Axial Fans Aps, Denamark | Supply and fabrication of aero-acoustic wind tunnel hub and casing components | 93.55 T |
March 2017 | Terex Malaysia Sdn Bhd | To Supply Raw Material, Tool & Equipment, Consumble, Skill Labour to Fabricate & Surface Treatment/Galvanizing for Terex MJ42-72A-1#01 Structure Steel (Revision 1) | 14.24 T |
March 2017 | Tai Crest Resources Sdn Bhd | To Fabricated Stainless Steel Flare Tip, Carbon Steel Fuel Skid Frame 850kg, Instrumentation Fab (Manifold), Pilot Burner, Gas Back Up Manifold | |
March 2017 | ISHI Power Sdn Bhd | To supply and fabricate for diverter chute unit 1 & unit 2(ISKL-JEP-ENQ-044) | |
January 2017 | TTCL Malaysia Sdn Bhd | Supply & Fabricate of Spray Ring Pipe Header-RAPID SCC project | 22 T |
January 2017 | ISHI Power Sdn Bhd | Supply & Fabricate of Galleries On Buckstay - Unit 1 & 2 | 74.9 T |
January 2017 | Terex Pegson Limited | To Supply Raw Material, Tool & Equipment, Consumble, Skill Labour to Fabricate & Surface Treatment/Galvanizing for Terex MJ42-72A-1#01 Structure Steel (Revision 1) | 10.5 T |
January 2017 | Terex Corporation USA | To Supply Raw Material, Tool & Equipment, Consumble, Fabrication, Inspection, Surface Treatment/Galvanizing for Terex US Modules MHS6203 x 2 units | 12 T |
January 2017 | ISHI Power Sdn Bhd | Supply & Fabricate Scaffolding Frame & Accessories REV A Unit 1 & Unit 2 | 200 T |
2016
# | Client | Project Description | Quantity |
---|---|---|---|
November 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Coal Bunker Chute for unit 2 Jimah East Power 2X1000MW Coal Fired Power Plant Negeri Sembilan. | 34 T |
November 2016 | Transwater API Sdn Bhd | Supply Material, Fabrication Piping & Structure Work, Inspetion & Testing, Blasting & Painting, Site Work at Johor Delivery at Place (DAP) to Site Kluang City Gate Upgrading Project | 54 T |
September 2016 | Terex Corporation USA | Supply galvanized and painting module structure MHS 8203-1 UNIT | 13 T |
September 2016 | Terex Malaysia Sdn Bhd | Fabrication of 1 unit Modules MHS6023-Supply Raw Material, Tool & Equipment, Consumble, Fabrication, Inspection, Surface Treatment/Galvanizing | 11.5 T |
September 2016 | ISHI Power Sdn Bhd | Fabrication and Delivery of Drip Pan for Safety Valve Unit 1 & 2 Jimah East Power 2x1000MW Coal Fired Power | 34.67 T |
August 2016 | Terex Corporation USA | Fabrication of MHS6023-Supply Raw Material, Tool & Equipment, Consumble, Fabrication, Inspection, Surface Treatment/Galvanizing | 12 T |
August 2016 | Arvos K.K., Japan | Supply & Fabrication of 2 sets of Lujungstrom Air Preheaters / 1 Boiler for Mitsubishi Hitachi Power Systems, Ltd. Kyushu Electric Power Co., Inc. / Matsuura Power Station No. 2 Project at Japan | 1208 T (2 units) |
August 2016 | ISHI Power Sdn Bhd | Fabrication and Delivery of Monorail Beam for Pulverizer, Boiler Are, GAH&SCR (Unit 1)Jimah East Power 2x10000MW Coal Fired Power & (Unit 2)Jimah East Power 2x10000MW Coal Fired Power | 117 T |
August 2016 | Terex Malaysia Sdn Bhd | Assy MJ42 Base Unit c/w Bolt Kit | 10 T |
August 2016 | Howden UK Limited | 2 Units Air Preheater for Java Island project | 146 T |
August 2016 | KROHNE (M) Sdn Bhd | Metering skids fabrication IB Supply CTM Skid 3" (U-1603) & IB Supply CTM Skid 2" (U-1604) for Petronas Honeydew CTMS Project MTBE Malaysia at Gebeng, Pahang, Malaysia | 2 units |
August 2016 | TEREX CORPORATION USA | Fabrication of MHS6023-Supply Raw Material, Tool & Equipment, Consumble, Fabrication, Inspection, Surface Treatment/Galvanizing | 12 T |
July 2016 | Dialog Plant Services Sdn Bhd | Supply, Cutting, Machining, Welding Temporary Test Blind for RAPID Pengerang | |
June 2016 | ISHI Power Sdn Bhd | Fabrication of Exhaust Piping U1 Fabrication of Exhaust Piping U2 | |
June 2016 | W2R AGGLOMERATION SOLUTIONS S/B | Supply Fabrication,Inspection & testing, Surface Treatment & Painting. Exworkshop for Conveyor, Structure, Handrail & Supports (Sakura "BREX" Plant) | 96 T |
June 2016 | JML Maintenance Sdn Bhd | Prefabrication of Piping & Supports | 21.7 T |
May 2016 | JGC (Malaysia) Sdn Bhd | Fabrication and Supply of Steel Structure Tank 7 New Jetty - PAF Project | 424.21 T |
May 2016 | Teras Teknologi Sdn Bhd | Manufacturing & Installation 2 units Cantilever VMS Gantry at Menora Tunnel KM262.5NB & 260.5SB and Modification and Reinstall existing horizontal gantry structure with new VMS panel for 3 units at Putrajaya, Dengkil & Senai | 10 T |
May 2016 | Whessoe Phillippines Construction, Inc | Supply, Manufacture, Delivery to CIF Laem Cha Bang Port for 22nos of 132 Slip On, Flat Face Flanges at Pumping Station and Site Erection & Installation Works for Package 2 Hydro- Mechanical Equipment For Xayaburi Hydroelectric Power Project. | |
May 2016 | Terex Malaysia Sdn Bhd | Fabrication Of MHS6203 Liner & Assembly 6203 | |
April 2016 | IHI Corporation, Singapore | Fabricate,Painting,Inspection For SAFI Independent Power Plant (SIPP) | 3.85 T |
April 2016 | Trelleborg Singapore Pte Ltd | Gripper Can / 45mm Dummy Pile / 70mm Dummy Pile & Test Spacer | |
April 2016 | Malaysia Transformer Manufacturing S/B | Complete Tank 12 MVA | |
April 2016 | Trelleborg Singapore Pte Ltd | Steel Flange OD1402ID1143 T76 PR Np:021271 | |
March 2016 | Terex Malaysia Sdn Bhd | Fabrication Of MHS6203 Liner & Assembly 6203 | |
February 2016 | Whessoe Phillippines Construction, Inc | Supply, Manufacture, Machining, Hot Dip Galvanized Packing and Delivery to CIF LAEM CHABANG Port c/w Site Erection & Installation Works for Studs, Nuts and Washers of 132 Flanges at Pumping Package 2 Hydro-Mechanical Equipment for Xayaburi Hydroelectric Power Project. | |
February 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Handrails & Ladders (Unit 1& 2) for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2) | 581 T |
February 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Chequered Plates (Unit 1& 2) for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2) | 496 T |
February 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Stair Stringers (Unit 1& 2) for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2 | 77.68 T |
February 2016 | Beaudrey Asia Sdn Bhd | Band Screen Structure and Accesorie | |
February 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Steel Structure Beams (Unit 1& 2) for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2) | 6748 T |
February 2016 | ISHI Power Sdn Bhd | Fabrication & Delivery Of Boiler Top Girder (Unit 1& 2) for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2) | 820 T |
February 2016 | Terex Malaysia Sdn Bhd | Fabrication MJ400MS02 | 15.24 T |
February 2016 | Terex Malaysia Sdn Bhd | Fabrication MJ400MS02 | 15.24 T |
January 2016 | Terex Malaysia Sdn Bhd | Fabrication Of MHS6203 Liner & Assembly 6203 | 11.5 T |
January 2016 | Terex Malaysia Sdn Bhd | Fabrication Of MHS6203 Liner & Assembly 6203 | 11.5 T |
January 2016 | Sarens JWS (M) Sdn Bhd | Fabricate Of Stiffeners Bracing Beam Extension Module Beam | 17.20 T |
January 2016 | Tech Infinity Engr Sdn Bhd | Supply & Fabrication metering skids 1xDI2000 & RS800 , 1xRSF2000 & 1xRSF1500 | 2.5 T |
January 2016 | JML Maintenance Sdn Bhd | Fabrication of Piping and Structural Support (approximately 45,000" DI) | |
January 2016 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 12.8 T |
January 2016 | ISHI Power Sdn Bhd | Fabrication of embedded materials anchor frame for 2x1000 MW Coal Fired Power Jimah Power Plant, N. Sembilan (Unit 1 & 2) | 100 T |
2015
# | Client | Project Description | Quantity |
---|---|---|---|
Decemebr 2015 | Teras Teknologi Sdn Bhd | Manufacturing & Installation complete with design & professional engineer endorsement | 4.088 T |
November 2015 | Scientific Design | Supply, Fabricate, Paint for one Chimney Stark | 8 T |
November 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 12.8 T |
November 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 12.8 T |
November 2015 | Sarens NV | Supply, Fabrication, Surface Coating and Delivery FOB Port Klang for 12 units Spreader Steel Mats.) | 163.8 T |
October 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS6203 Structural Base | 12.8 T |
October 2015 | Macglotech Steel Service S/B | Supply 8 Units Stainless Steel Annealing Tank) | 3 T |
September 2015 | Whessoe Phillippines Construction, Inc | Supply, Manufacture, Machining, Hot Dip Galvanized Packing and Delivery to CIF LAEM CHABANG Port c/w Site Erection & Installation Works for Studs, Nuts and Washers of 132 Flanges at Pumping Package 2 Hydro-Mechanical Equipment for Xayaburi Hydroelectric Power Project. | 40 T |
September 2015 | Whessoe Phillippines Construction, Inc | Supply, Manufacture, Delivery to CIF Laem Cha Bang Port for 22nos of 132 Slip On, Flat Face Flanges at Pumping Station and Site Erection & Installation Works for Package 2 Hydro- Mechanical Equipment For Xayaburi Hydroelectric Power Project. | 68 T |
September 2015 | Trelleborg Singapore Pte Ltd | Fabrication & Machining Steel Flange - 20 sets | 6.2 |
September 2015 | LINDE Malaysia Sdn Bhd | Supply, Fabricate & Install Bundle Frame MK6 MCP-416 units | 101.5 T |
August 2015 | ISHI Power Sdn Bhd | Fabrication and Supply of Heater Rotor, Static Parts and Miscellenous partd for Four Corners Unit A,B,C, & D Project at USA | 1320 T (330T each |
August 2015 | ANDRITZ Ulu Jelai Project Sdn Bhd | Fabrication Works, Hot Dip Galvanized and inland transport for Pipe Spools | 20 T 1,376 DI |
August 2015 | Scientific Design | Supply, Fabricate & Painting for 2500 rotary dryer bag filter | 11 T |
August 2015 | ABB (M) Sdn Bhd | Fabrication Base Frame & Litting Equipment for ABB 400V | 6.4 T |
July 2015 | LINDE Malaysia Sdn Bhd/td> | Supply, Fabricate & Install Bundle Frame MK6 MCP | 22 T |
July 2015 | Terex Malaysia Sdn Bhd | Assy MJ42 Base Unit & Feed Plate) | 10.53 T |
July 2015 | Terex Malaysia Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.22 T |
June 2015 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply, Fabricate, painting for Lemoi Stoplog 1. Side Guides - 1 pkg & 2. Modify Existing Stoplog | |
June 2015 | Terex Malaysia Sdn Bhd | Fabrication of MC380X- 2units, MC450X- 1 unit, TC1150- 1 unit | 24 T |
June 2015 | METIX Malaysia Sdn Bhd | Structural Fabrication works for Sakura Project, CIF Bintulu Port | 96 T |
June 2015 | LINDE Malaysia Sdn Bhd | Supply, Fabricate & Install MK6 MCP Bundle Frame - 100 units | 25 T |
May 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | |
May 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | |
May 2015 | Malaysia Transformer Manufacturing S/B | Supply of Complete Tank 30MVA 203 (Rev F) - 18 units | 18 units |
May 2015 | Terex Malaysia Sdn Bhd | Supply, Fabrication, Painting and Deliver Ex-Subang Terex Shop for MC380X SS01 - 2 units | |
May 2015 | Terex Malaysia Sdn Bhd | Fabrication of MC450X 2 units, MC380X 2units, MC 1150 2units | |
May 2015 | JML Maintenance Sdn Bhd | Variation Order on the Additional Economizer Coil Works at JEV | |
May 2015 | Terex Malaysia Sdn Bhd | Fabrication MV 2000 SS01- 2unit | |
May 2015 | Transwater API Sdn Bhd | Fabrication & Supply North Sabah Liquid Metering Piping - 6.5m (L) x 4.2m (W) x 2.4m (H) without structure skids | 5 T |
May 2015 | JML Maintenance Sdn Bhd | Supply and Fabrication of Cold Area and Cullet Area Batch Plant | 7 T |
April 2015 | Teras Teknologi Sdn Bhd | Manufacturing and Installation of 3 units Full VMS Gantry complete with Design & Professional Engineer Endorsement at KM40235NB, KM15.4NB and KM130.75 NB | 15 T |
April 2015 | LION TIN Sdn Bhd | Supply fabricate and installation of steel work for Jig Plant | |
April 2015 | JML Maintenance Sdn Bhd | Supply, Fabrication and Delivery FOT, Inclusive Painting works for MSGT JB2F Cold Repair of Furnace Steel Works and Hot Area Piping Repair works for NSG Plant, Johor | 35 T |
April 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 10.89 T |
April 2015 | JML Maintenance Sdn Bhd | Supply and Fabrication of Cold Area and Cullet Area Batch Plant | 7 T |
March 2015 | Salini Malaysia Sdn Bhd | Supply & Fabrication Power Tunnel Formwork | 20 T |
March 2015 | Beaudrey Asia Sdn Bhd | Supply & Fabrication of Band Screen Structure - 2 units, Band Screen Head Structure - 2 units | 9.3 T |
March 2015 | Tech Infinity Engr Sdn Bhd | Supply material, fabrication work, acid cleaning SUS 304 material for PRISM Project. 1) Sliding gate 6.4m x 0.6m x 2.4m - 3 unit | 0.7 T |
March 2015 | IHI Corporation, Singapore | Supply & Fabricate of Monorail Beams - 2 units for SAFI INDEPENDENT POWER PLANT (SIPP) UNIT 1 & 2 | 118 T |
March 2015 | Megasteel Sdn Bhd | Supply labour,material, tools and all necessary equipment to fabricate and delivery 10 units of radiant cooler for EAF1 - Outlet pipe 750 OD x 3t x 27000 x 1 LG, 3t x 29000 x 1 LG & elbow 4.5t x 750 OD x 1 LG | 33 T |
March 2015 | Care Ion Technologist Sdn Bhd | Design, Fabrication, Inspection & Testing, Blasting & Painting, Delivery Ex-Workshop, Bukit Kemuning for 30 units Dry Gas Filter 300# | 4.7 T |
March 2015 | Malaysia Transformer Manufacturing S/B | Supply of Full Welded 30 MVA 201 (33/11kV) | 1 unit |
February 2015 | Transwater API Sdn Bhd | Shop Fabrication & Site Installation Piping & Mechanical works for Tebong City Gate Project PGB | 25 T |
February 2015 | Trelleborg Singapore Pte Ltd | Machining Loadout Pad 1 set Tooling | 6.3T |
February 2015 | Dialog Plant Services Sdn Bhd | Supply, Fabrication, Testing, Inspection and Delivery of 4 units Pig Launchers / Receivers for Project EPCC of Independent Deepwater Petroleum Terminal, Pengerang, Johor Darul Ta'zim | |
February 2015 | Terex Malaysia Sdn Bhd | Fabrication MC 450X Cone Module | 7.66 T |
February 2015 | Beaudrey Asia Sdn Bhd | Supply & Fabrication of M843614- Stoplog, Trash Rake and Band Screen - 2 sets | 5.8T |
February 2015 | JML Maintenance Sdn Bhd | Supply Listed Raw Materials, Tools, Equipment, Gases and Skilled Labour for Fabrication and Delivery FOT inclusive of Painting Works and Ex-Workshop Delivery for MSGT JB2F Cold Repair Works for NSG Plant, Johor | 200T |
January 2015 | Top-Mech Provincial Sdn bhd | Fabrication, Machining, PWHT, Trial Assembly and Painting for 1 set Rear Jig | 2.778T |
January 2015 | Puncak Melewar Sdn Bhd | Fabrication VMS Gantry@ KM 18.25NB, 25.90EN, 21.20EN, 19.10SB, 445.2SB with 25m span c/c poles - 5 units | 32.5 T |
January 2015 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 10.89 T |
January 2015 | IHI Corporation, Singapore | Supply Embedded Material for Safi Independent Power Project, Morocco for Boiler Structure - 2 units and Mill Pulveriser -2 units | 174 T |
2014
# | Client | Project Description | Quantity |
---|---|---|---|
December 2014 | IHI Power System (M) Sdn Bhd | Fabrication and Supply Burner Throat Ring - 10 Sets for 2 x 700MW Jimah Coal Fired Power Plant, N.Sembilan | |
December 2014 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply, Fabricate, Galvanized for Base Frame, Tunnel Pipe Support and Cable Tray Support | |
December 2014 | LINDE Malaysia Sdn Bhd | Supply & Fabricate and install Mk6 MCP- 4 units + 35 units = Total 39 units | 9.75 T |
December 2014 | Howden Axial Fans APS, Denmark | Supply and Fabrication Static Parts Total - 4 pcs (Left 2 pcs & Right 2pcs) for Craig Project, USA | 72 T |
December 2014 | ANDRITZ Ulu Jelai Project Sdn Bhd | Fabrication of Penstock Support | 2 T |
November 2014 | Salini Malaysia Sdn Bhd | Fabrication of Steel Ribs | |
November 2014 | Terex Malaysia Sdn Bhd | Fabrication MV 2000 SS01- 1unit | |
November 2014 | IHI Corporation, Singapore | Fabrication & Supply of Measuring Tap for Air Duct, Gas Duct & Boiler for Project MNS Suzukawa, Japan | 1.358 T |
November 2014 | Terex Malaysia Sdn Bhd | Fabrication of MHS8203 Structural Base | 10.89 T |
November 2014 | Terex Malaysia Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.22 T |
November 2014 | Terex Malaysia Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.22 T |
November 2014 | Terex Malaysia Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.22 T |
November 2014 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply & Fabricate Penstock Pressure Test Equipment - 1 package for Ulu Jelai Hydroelectric Project, Pahang, Malaysia | |
October 2014 | JML Maintenance Sdn Bhd | Fabrication & Assembly works for 3 units of Economizer Coils to Tanjung Bin Power Plant, Pontian, Johor, Malaysia | 534 T |
October 2014 | Terex Malaysia Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 9.4 T |
October 2014 | Terex Malaysia Sdn Bhd | MC1300 Structure & Walkway Fabrication, Crusher Feed Box, Pulley Guard Assembly | 18.4 T |
October 2014 | Terex Malaysia Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 4.7 T |
October 2014 | Asian Offshore Services Sdn Bhd | Structural Fabrication works for 15 cabins Provision for Jack Up Barge 100 Accomodation project. | 10.82 T |
October 2014 | Terex Malaysia Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 4.7 T |
September 2014 | BCI Mechanical Fabrication Sdn Bhd | Machining works for 1 set Upper and Lower Exit End Ring | |
September 2014 | IHI Power System (M) Sdn Bhd | Burner Throat Ring & Buckstay Tension Plate - 6 pcs for 2 x 700MW Jimah Coal Fired Power Plant, N.Sembilan | |
August 2014 | LION DRI Sdn Bhd | Remove and Install Furnace Upper Seal Leg, Upper Seal Gas Inlet Cone EL+80m; To replace portion of top gas scrubber weir water overflow pipe; Remove and Install Furnace Lower Cone c/w shaft assembly EL+40m | |
August 2014 | LION DRI Sdn Bhd | Hot Combustion Air Heater - 4 units; Cold Combustion Air Heater- 2 units; Reformer Tube - 12 units | |
August 2014 | BCI Mechanical Fabrication Sdn Bhd | Drilling Holes and Assembly of the SNIM Dumper, Trippler Maintenance Access | |
August 2014 | Terex Malaysia Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
August 2014 | LION DRI Sdn Bhd | Fabrication New Platform at Level EL + 41775; Fabrication Temporary Gas Pipe Support at Heat Recovery Manifold | 2.9 T ; 3 T |
August 2014 | Impsa (Malaysia) S/B | Rolling Plate 63.5mm thk - 2 pcs | 10.89 T |
August 2014 | Wah Hai Marine Supplies (M) Sdn Bhd | 1000mm Quick Fit Pipe with Flange - 50pcs | 17.2 T |
August 2014 | Terex Malaysia Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 4.7 T |
August 2014 | BCI Mechanical Fabrication Sdn Bhd | Machining works for Entry & Exit End Ring with 2 Ballast Box Connection and 8 Main Pin Connection; Machining works for connection plates of Upper & Lower Exit End Ring (Total 4 surface) | 54 T; 27 T |
August 2014 | Terex Malaysia Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 4.7 T |
August 2014 | BCI Mechanical Fabrication Sdn Bhd | Machining works for Entry & Exit End Ring with 2 Ballast Box Connection and 8 Main Pin Connection; Machining works for connection plates of Upper & Lower Exit End Ring (Total 4 surface) | 54 T; 27 T |
August 2014 | LION TIN Sdn Bhd | Supply manpower for Steel Structure Maintenance Work and Existing Steel Bridge at Brooklyn | |
August 2014 | Terex Malaysia Sdn Bhd | Fabrication MC 450X Cone Module | 7.66 T |
July 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of Structural Base MJ 47 | 38.56 T |
July 2014 | JML Maintenance Sdn Bhd | Fabrication & Supply 2 units of Economizer Coils to Jimah Power Plant, N.Sembilan, Malaysia | 356 T |
July 2014 | LINDE Malaysia Sdn Bhd | Supply, Fabricate & Install MK6 MCP Bundle Frame - 40 units | 10T |
June 2014 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply & Fabricate Lifting Device, Lifting Beam, Suport Transport Carriage for Bottom Outlet, Rail for Bottom Outlet | 14.55 T |
June 2014 | Tech Infinity Engr Sdn Bhd | Fabrication works for Launcher, Block Valve and Receiver and Metering Skid for PRAI PRISM Lateral II Project | 65 T; 6000DI |
June 2014 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply Transformer Rails c/w Accessories | |
June 2014 | LINDE Malaysia Sdn Bhd | Supply & Fabricate and install Mk6 MCP Bundle Frame- 38 units | 9.5 T |
May 2014 | Asian Offshore Services Sdn Bhd | Supply material, Fabrication, Painting and Delivery Free on Truck at Sg Buloh for One Unit P130 AFREN E-house Structure: 4.35mW x 10.5mL x 4.3mH x 13.7 ton Inclusive of rain canopy, double plate, plinth support, removable floor and standing support | 13.7 T |
May 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
May 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
May 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
April 2014 | Terex/Jaques (International) Sdn Bhd | MC1300 Structure & Walkway Fabrication, Crusher Feed Box, Pulley Guard Assembly | 6.132 T |
April 2014 | Terex/Jaques (International) Sdn Bhd | MC1300 Structure & Walkway Fabrication, Crusher Feed Box, Pulley Guard Assembly | 6.132 T |
March 2014 | Asian Offshore Services Sdn Bhd | Supply material, Fabrication, Painting and Delivery Free on Truck at Sg Buloh for One Unit P128 Petrochad E-House Structure Module & One Unit Lifting Frame & misc parts2 | 16.7 T |
March 2014 | IHI Corporation, Singapore | Measuring Tap for Duct, Observation Door and Boiler Wall Accessories for Cochrane Thermoelectric Power Plant Project Unit #2 | 9.54 T |
March 2014 | IHI Corporation, Singapore | Measuring Tap for Duct, Observation Door and Boiler Wall Accessories for Cochrane Thermoelectric Power Plant Project Unit #1 | 9.54 T |
March 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
March 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
March 2014 | Howden Denmark APS | Supply and Fabrication Axial Fan Static Part - 4 pcs for Welsh Project, USA | 210.08T |
March 2014 | LINDE Malaysia Sdn Bhd | Design and Fabrication He Pressure Vessel & Installation Works for 15m3 buffer tanks for helium recovery system. | 4.5 T |
March 2014 | Aquaterra Enery Limited, Norwich | Fabrication and Supply of Centralisers- 4pcs and Stop Collars- 8pcs | 2.4 T |
February 2014 | Terex/Jaques (International) Sdn Bhd | Supply & Fabrication of Rock Breaker 978247 Frame & Platform - 1 unit. Structural Walkway and Support Structural | 8.57 T |
February 2014 | Howden Denmark APS | Supply and Fabrication Axial Fan Static Part- 1 pc for Northeastern #3 Project, USA | 58.87 T |
January 2014 | BCI Mechanical Fabrication Sdn Bhd | Fabrication of SNIM Dumper Cage- 1 unit | 118 T |
January 14 | Terex/Jaques (International) Sdn Bhd | Fabrication of Structural Base MJ 47 | 45.72 T |
January 2014 | Howden Denmark APS | Supply and Fabrication Axial Fan Static Parts (Left & Right) - (1 set: 2 pcs) for Flint Creek Project, USA | 100 T |
January 2014 | Terex/Jaques (International) Sdn Bhd | Fabrication of TC1000 Static Structural (Rev 3) for MC1000 | 5 T |
2013
# | Client | Project Description | Quantity |
---|---|---|---|
December 2013 | Terex/Jaques (International) Sdn Bhd | Fabrication of three (3) units of MJ 42A Base Structure | 30.75T |
December 2013 | JGC (Malaysia) Sdn Bhd | Repair Pipe Cargo Bucket - 105 sets | 550T |
November 2013 | Favelle Favco Cranes (M) Sdn Bhd | Machining Main Yoke, Bogie Yoke, Primary Equiliser A & B, Secondary Equiliser A & B, Bogie Type A,B,C,D,E. | |
November 2013 | O & G Works Sdn Bhd | Fabrication, Machining & Drilling Pedestal Crane- 1unit | 6.939 T |
October 2013 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
October 2013 | IHI Power System (M) Sdn Bhd | Burner Throat Ring & Buckstay Tension Plate - 6 pcs for 2 x 700MW Jimah Coal Fired Power Plant, N.Sembilan | |
October 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Additional works for supply of manpower, machine facilities, tools & equipment to bore M72 x 6 with 120 holes and complete with tapping M6 Thread on stay rings | |
October 2013 | Terex/Jaques (International) Sdn Bhd | MC1300 Structure & Walkway Fab - 2 ea, Crusher Feed Box - 2 ea, Pulley Guard Assembly - 2 ea | 6.132 T |
October 2013 | Terex/Jaques (International) Sdn Bhd | TC1000 Static Structural (Rev 3) for MC1000 | 5 T |
September 2013 | LION DRI Sdn Bhd | Supply material, fabrication, and refactory work for two new sets of cold combustion, air preheater tube bundles, and delivery to LION DRI, Banting | |
September 2013 | Dialog Plant Services Sdn Bhd | Supply, Fabrication, Testing, Inspection and Delivery of Pig Launchers / Receivers for EPCC of Independent Deepwater Petroleum Terminal, Pengerang, Johor Darul Ta'zim project. | 43.2 T |
September 2013 | IHI Corporation, Singapore | Supply & Fabricate Monorail Beams for Cochrane Thermoelectric Power Plant Project, Chile Delivery FOB: Dec 2013 & Mar 2014 |
71.26 T |
September 2013 | IHI Corporation, Singapore | Supply & Fabricate Coal Bunkers for Cochrane Thermoelectric Power Plant Project, Chile Unit 1- Delivery FOB Mar 2014 Unit 2- Delivery FOB Mid July 2014 |
593 T |
August 2013 | ABB Solutions (M) Sdn Bhd | Fabrication of Base Frames - 14 pcs | |
August 2013 | Terex/Jaques (International) Sdn Bhd | MJ 42 Base Structure (Rev 1) - 1 ea | 10.25 T |
August 2013 | Terex/Jaques (International) Sdn Bhd | MC1300 Structure & Walkway Fab - 2 ea, Crusher Feed Box - 2 ea, Pulley Guard Assembly - 2 ea | 6.132 T |
July 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply of Hydromechanical Equipment for Ulu Jelai Hydroelectric Project, Malaysia Telom Bypass/Overflow channel stoplog - 4 pcs | 3.638 T |
July 2013 | Terex/Jaques (International) Sdn Bhd | Supply & Manufacturing One (1) unit Canica Model C2000 Crusher machine | 5T |
July 2013 | LION DRI Sdn Bhd | Supply, manpower, tools, consumable to perform shutdown work in LION DRI | |
July 2013 | LION DRI Sdn Bhd | Supply manpower for LION DRI | |
July 2013 | Terex/Jaques (International) Sdn Bhd | Supply & Fabrication of TC1000 Static Structural (Rev 3) - 2 units | 10T |
July 2013 | Tech Infinity Engr Sdn Bhd | Supply, Fabricate, Testing and Installation works for Metering Skids Kerteh City Gate Station, Terengganu - 1 set | 9 T 1300 dia inch |
June 2013 | JGC (Malaysia) Sdn Bhd | Supply & Fabrication of Platform & Ladder for Petronas LNG Train 9 Project, Malaysia. | 330T |
June 2013 | JGC (Malaysia) Sdn Bhd | Shop Fabrication of Steel Structure for Petronas LNG Train 9 Project, Malaysia. | 1354T |
June 2013 | Koniambo Nickel SAS | Supply spare parts for Water Cooled Roof Panel. (Plate, Cover, Type, Wedge, Locking, Turnbuckle, Flange, Pulley, etc.) | |
June 2013 | Dialog Fabricators Sdn Bhd | Plate Rolling Works for Zuhal East Development Project. Plate 32mm, 38mm, 45mm, 50mm , 60mm - total 52 pcs | 256 T |
May 2013 | BCI Mechanical Fabrication Sdn Bhd | Machining services; Tipping wheel half spider, Tipping wheel shaft Drive wheel Half spider, Bore holes drive base & milling | 34.4 T |
May 2013 | BCI Mechanical Fabrication Sdn Bhd | Construct, fabricate, build and install gantry and framework for VMS at KM303.75NB PLUS NSE Kajang-UPM | 24 T |
May 2013 | Zanwa Sdn Bhd | Supply and Fabrication of Transformer Metal Parts 90 MVA | 36 T |
May 2013 | ItraMAS Technology Sdn Bhd | Supply & Fabricate and Installation of 11 units of VMS Full Gantry at Second Bridge and Surrounding areas. | 25 T |
May 2013 | LINDE Malaysia Sdn Bhd | Supply & Fabricate and install Mk6 MCP- 150 units | 37.5 T |
May 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply & Fabrication of Telom and Lemoi Stoplogs , Level Measurement for Ulu Jelai Hydroelectric Project, Pahang, Malaysia | 16.65 T |
May 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply & Fabrication of Power Intake Gates for Ulu Jelai Hydroelectric Project, Pahang, Malaysia | 132.8T |
May 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply & Fabrication of Bottom Outlet Gates for Ulu Jelai Hydroelectric Project, Pahang, Malaysia | 231.6T |
May 2013 | Teras Teknologi Sdn Bhd | Manufacturing & Installation 5 units Full VMS Gantry at Northern and Southern E1 & E2 PLUS Highway | |
May 2013 | Aquaterra Enery Limited, Norwich | Grouting Enclosure - 4 sets | 2.8T |
April 2013 | Howden UK Limited, Belfast, North Ireland | Supply and Fabrication of 1 set Air Preheater Parts for Davao Project Number H008522/01 | 116 T |
March 2013 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
March 2013 | Terex/Jaques (International) Sdn Bhd | MC1300 Structure & Walkway Fabrication, Crusher Feed Box, Pulley Guard Assembly | 6.132 T |
March 2013 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
March 2013 | IHI Corporation, Singapore | Fabrication & Delivery of EHC-5 Misc Piping Materials | 29 T |
March 2013 | BCI Mechanical Fabrication Sdn Bhd | Machining services; Tipping wheel half spider, Tipping wheel shaft Drive wheel Half spider, Bore holes drive base & milling | 34.4 T |
March 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply of Turbine Parts 2nd Lot for Ulu Jelai Hydroelectric Project, Malaysia | 90.53T |
February 2013 | ANDRITZ Ulu Jelai Project Sdn Bhd | Anchor Plates for Bottom Outlet for Ulu Jelai Hydroelectric Project - 28 sets | 12.5 T |
February 2013 | IHI Corporation, Singapore | Baffle plates for EHC-5 HRSG Restraints | |
January 2013 | Salini Malaysia Sdn Bhd | Steel Formwork Type 1 & 2 for Ulu Jelai Hydroelectric Project, Malaysia | 7.5 T |
January 2013 | Howden UK Limited, Belfast, North Ireland | Supply and Fabrication of 1 set AirPreheater Parts for Termotasajero Project Number H008516 | 159 T |
January 2013 | LINDE Malaysia Sdn Bhd | Supply & Fabricate and install Mk6 MCP- 387 units | 96.7 T |
2012
# | Client | Project Description | Quantity |
---|---|---|---|
December 2012 | BCI Mechanical Fabrication Sdn Bhd | Machining services; Tipping wheel half spider, Tipping wheel shaft Drive wheel Half spider, Bore holes drive base & milling | 34.4 T |
December 2012 | Howden UK Limited, Belfast, North Ireland | Fabrication & Supply of 1 set of left & right Axial Fan Static Parts for Pawnee project. | 100 T |
December 2012 | IHI Corporation, Singapore | Supply of Measuring Taps CIF Jakarta Port, indonesia | 0.52 T |
November 2012 | IHI Corporation, Singapore | Fabrication of HRSG Restraints for Hachinohe HRSG Project (EHC-5) in Japan | 13.47 T |
November 2012 | IHI Corporation, Singapore | Delivery CIF for KM-7 project balance materilas to Jakarta | |
November 2012 | Teras Teknologi Sdn Bhd | Manufacturing & Installation of 5 units Full Gantry at selected location PLUS NSE. | 25 T |
October 2012 | IHI Corporation, Singapore | Delivery of balance materials KM-7 to PTCF for EHC-5 Project casing / ducting | 13.47 T |
September 2012 | BCI Mechanical Fabrication Sdn Bhd | Machining services; Tipping wheel half spider, Tipping wheel shaft Drive wheel Half spider, Bore holes drive base & milling | 34.4 T |
September 2012 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply of Hydromechanical Equipment for Ulu Jelai Hydroelectric Project, Malaysia | 90.53 T |
September 2012 | ANDRITZ Ulu Jelai Project Sdn Bhd | Supply of Turbine Parts for Ulu Jelai HEPP Malaysia Project | 286 T |
September 2012 | ALSTOM Services Sdn Bhd | Supply & Fabrication of Vent Stacks for Manjung 4, 1 x 1000MW Power Plant (Boiler), Perak | 20 T |
September 2012 | LION TIN Sdn Bhd | Dredgeability and Mineral Extraction Study for Kuala Langat Tin Project | 1 LOT |
September 2012 | IHI Corporation, Singapore | Supply materials for middle support EH-5 to Indonesia | |
August 2012 | Dialog Fabricators Sdn Bhd | Fabricate and Painting of 10 units of API 650 Storage Tank for 3679 Northern Oil Refineries Pty Ltd Gladstone Refinery Project | 165.7 T |
August 2012 | Corporación Nacional del Cobre de Chile, CODELCO | Requisition No 11FP63R038 Structural Elements for Flash Furnace for the project Design Improvement of Flash Furnace Settler |
440 T |
August 2012 | Terex/Jaques (International) Sdn Bhd | Fabrication of one (1) unit of MJ 42A Base Structure | 10.25 T |
August 2012 | TCM Corporation, JAPAN | Manufacturing of TCM RTG Crane (17 units) for North Port Malaysia | 1333 T |
July 2012 | Asian Offshore Services Sdn Bhd | Steel Fabrication works for 40 Men Living Quarters Modular for Serendah Accommodation Topside Facilities for Murphy Sarawak Oil Co., Ltd. | 250 T |
July 2012 | Teras Teknologi Sdn Bhd | Construct, fabricate, build and install gantry and framework for VMS at KM303.75NB PLUS NSE Kajang-UPM | 5 T |
July 2012 | Terex/Jaques (International) Sdn Bhd | 3 units TC 1000 Static Structural | 3 units |
June 2012 | Soon Brothers Machinery Sdn Bhd | Fabricate & Painting the Scrap Banden Machine - 1 set | 1 set |
June 2012 | Alstom Hydro Malaysia Sdn Bhd | Supply & Fabrication of Spiral Case and Embedded Parts for Hulu Terengganu Hydroelectric Project | 86 T |
April 2012 | Asian Offshore Services Sdn Bhd | PTSC - HST/HSD Electrical &Instrument Room. Supply material, fabrication, painting and delivery Ex-Workshop for 1 unit of HSD- A Well Head Platform and 1 unit of HST- E & I Equipment Room | 16.16 T 9.15 T |
April 2012 | Favelle Favco Cranes (M) Sdn Bhd | To supply labour, tools and equipment for machining 16 units of Favelle Favco's Reinforced Tower:Serial No: SN1787 (M1280D) | 16 units |
March 2012 | ANDRITZ Ulu Jelai Project Sdn Bhd | Diversion Tunnel Stoplogs and Main Flushing Gates for Ulu Jelai Hydroelectric Project | 81 T |
February 2012 | LINDE Malaysia Sdn Bhd | Supply & Fabricate and install Mk6 MCP - 342 units | 85.5 T |
February 2012 | Osborne & Chappel Sdn Bhd | Additional six (6) compartments Double Plating Works for SMTD Tanjong Tualang Ex-TT5 dredge | |
February 2012 | TCM Corporation, JAPAN | Manufacturing of TCM RTG Crane (10 units) for North Port Malaysia | 784 T |
February 2012 | Dredging International (DEME), Singapore | Supply & Fabrication of Pontoon for Floating Pipeline - 5 units | 8.9 T |
February 12 | IHI Corporation, Singapore | Fabrication, Painting and Deliver (CIF) - HRSG Baffle Plates for the HRSG of Touden Kashima Project (KM-7) in Japan | 94T |
January 12 | IHI Corporation, Singapore | Fabrication, Painting and Deliver (CIF) - HRSG Restraints for the HRSG of Touden Kashima Project (KM-7) in Japan | 265T |
January 2012 | Dialog Fabricators S/B | Fabrication and Installation of Superstructural steel works for Tarpon System Marginal Oil Field Platform – 4 sets | 1000 T |
January 2012 | LION DRI Plant Sdn Bhd | To supply manpower, equipment & machinery to work on shut down mantenance work and supply 1 unit of 2T winch c/w wire & commissioning for Lion DRI | |
January 2012 | Osborne & Chappel Sdn Bhd | Supply labour, fabricate & weld for compartments- Double Plating Works for SMTD Tanjong Tualang, Perak | 6 |
2011
# | Client | Project Description | Quantity |
---|---|---|---|
November 2011 | FLSmidth Pty Ltd, Australia | Fabrication for Mobile Stacking Conveyor Parts including of Guard Assembly, Track Panel, Tail Section Guard, Wear Liner Plate, Track Frame DSA, Grizzly Bar Support, MSC Hopper Chute, Containment Hood, Jack Base. | 40 T |
November 2011 | Dialog Fabricators Sdn Bhd | Plate rolling works and blasting & Painting Package C for project of the provision of engineering, procurement, Contruction and Load Out of Wellhead for Balai, Bentara, Spaoh and West Acis Fields. | 291 T |
October 2011 | Asian Offshore Services Sdn Bhd | Supply material, fabrication & Painting for Analyzer House | 5 T |
October 2011 | JGC Corporation, Yokohama | Supply & Fabrication of Platform & Ladder for Singapore Hydro-Desulfurization Projects at Jurong Island, Singapore, for ExxonMobil Asia Pacific Pte Ltd | 176 T |
August 2011 | IHI Power System (M) Sdn Bhd | Supply, Fabricate & Delivery of Burner throat Ring - 12 sets | |
August 2011 | Osborne & Chappel Sdn Bhd | Repairing pontoons, Refloating and Stabilizing of Partially Submerged Dredge at 5th Mile Stone, Batu Gajah- Tg Tualang Rd Perak, Malaysia | |
August 2011 | Teras Teknologi Sdn Bhd | Manufacturing & Installation of 5 units Full Gantry & 2 units Cantilever Gantry for VMS at PLUS North South Highway | |
July 2011 | Alstom K.K., Japan | Supply & Fabrication of Sector Plate for Air Preheater Manjung Power Station, Malaysia | 142 T |
July 2011 | Terex/Jaques (International) Sdn Bhd | Supply & Fabrication of Canica VSI2000 (Crusher Machine) | 10 T |
July 2011 | Highbase Resources S/B | Design, manufacturing and installation of 2 (two) units VMS's Gantry Structure and civil footing at Grand Saga Highway. | 12 T |
June 2011 | IHI Corporation, Singapore | Supply & Fabrication of MOL Welded Pipes (19mm thk - 32pcs) | |
June 2011 | FLSmidth MVT Gmbh, Germany | Supply, Fabrication and Machining Apron Feeder, Lamella Plates & Jigs | 108 T |
June 2011 | IHI Corporation, Singapore | Material Supply & Fabrication of Measuring Taps for Air & Gas Ducts for Morocco Jorf Lasfer Project. Unit #5- Delivery Jan 2012, Unit #6- Delivery May 2012 | 2 units |
May 2011 | Dredging International (DEME) | 2 Boogie's Assembly Fabrication of Moving Blocks, Roller Block for Spud Carrier, Pin & Bush and SKF Bearings | 4 pcs |
March 2011 | Mox Linde Gases Sdn Bhd | Supply & Fabrication of Bundle Frame MK VI Bundle Assembly | 400 pcs |
February 2011 | Shell MDS (M) S/B | Supply & Fabrication of Steel Structure, Floor Support, Grating, Handrail, Pipe Support, Equipment Support and Structure Support for SMDS Process Safety Upgrades Project at Bintulu, Sarawak, Malaysia | 82 T |
February 2011 | BCI Engineering,HK | Supply, Manufacturing, Surface Treatment and Delivery FOB Port Klang of One Set Tipping Wheel, Drive Wheel for Spare part. | 22.6 T |
February 2011 | Vosta LMG BV Amsterdam | Fabrication, Supply & Delivery of; 1) Draghead Gantry PS & SB 2) Intermediate Gantry PS & SB 3) Trunnion Gantry PS & SB 4) Service Frame PS & SB for Order No. 2009.0.1132 to Selat Melaka Shipyard, Pulau Lumut, Malaysia |
92 T |
February 2011 | HATCH Ltd Canada | Supply raw material, tools and equipment, consumable, skill labor to fabricate, assembly and delivery FOB Port Klang for 6 Electrode Columns- Upper Assembly for Qinghai Salt Lake Industry Group: Haina – QSLG, China | 200 T |
February 2011 | HATCH Ltd Canada | Supply raw material, tools and equipment, consumable, skill labor to fabricate, assembly and delivery FOB Port Klang for 24 Electrode Columns- Upper Assembly for Qinghai Salt Lake Industry Group: Golmud – QSLG, China | 800 T |
January 2011 | Vantage Dredging Technology S/B | Design manufacture, supply, delivery, testing & commissioning of One(1) unit CSD 450S inclusive of spare parts and one man accommodation cabin for the River Dredging Work for Messrs Lion Waterway Logistics S/B | 119 T |
January 2011 | Macglotech Steel Service S/B | Supply Raw material, consumable, tools, equipment and labour to fabricate and delivery ex-workshop for 10 units annealing rack | 10 units |
January 2011 | Koniambo Nickel SAS | Manufacturing and Supply of Water Cooled Roof Panels for Koniambo Nickel Project, New Caledonia | 173 T |
2010
# | Client | Project Description | Quantity |
---|---|---|---|
December 2010 | Vosta LMG BV Amsterdam | Dredge Equipment for Order 2010.10.1135 for CSD 600S to Jordan Modern Industries, Amman, Jordan | 230 T |
October 2010 | Galaxy Variety Sdn Bhd | steel Roof Swing rail - Material SCMN 3A - 2 pcs and Machining Roof Swing Rail | |
September 2010 | Alstom Hydro Malaysia S/B | Supply and delivery of 4 sets Air Guides for the Bakun Hydroelectric Project, Sarawak, Malaysia. | |
August 2010 | Yun Yang Temple (Australia) Inc | Supply and fabrication to manufacture 2 walkways linking main shrine to multifunction hall and meditation hall | 45 T |
August 2010 | Highbase Resources S/B | Overhead Gantries Fabrication, VMS Panel Installation - 2 units for Projek Gerbang Selatan Bersepadu, Johor Bahru | |
August 2010 | LION DRI Plant Sdn Bhd | Modification of Charge Hopper Feet Conveyor CV-F11 to Sliding Chute System Shutdown Task No. ST-MAT-18 | 12 T |
August 2010 | Vosta LMG BV Amsterdam | Dredge Equipment for Order 2010.10.1134 for CSD 600S to Jordan Modern Industries, Amman, Jordan | 230 T |
August 2010 | Koniambo Nickel SAS | Fabricate, Machining and Surface Treatment c/w coating, delivery FCA Workshop for Furnace Slag Launder Frame | 22.4 T |
July 2010 | LION DRI Plant Sdn Bhd | Shutdown Piping Jobs at LION Dri, Banting | |
July 2010 | LION DRI Plant Sdn Bhd | Repair welding 3 units of Transport Car | |
July 2010 | BCI Engineering,HK | Fabrication works of Tipping wheel assembly & Drive wheel assembly for Essar 2 Project, India | 107 T |
July 2010 | Hammer Engineering Sdn Bhd | Fabricate Gas Metering & Regulating station F500, F2000, NDE-DPT, Hydrotest | 4 T |
July 2010 | Alstom K.K., JAPAN | Fabrication of Ljungstrom Air Preheater for HITACHINAKA Unit 2 Project for The Tokyo Electric Power Company Incorporated, Japan. - Package 1 Unit A&B and Package 2 | 684 T |
July 10 | Petrochemical & Power Plant Services S/B | Variation Order for fabrication of Additional Ducting & Secondary Structures | 98 T |
June 2010 | Tech Infinity Engr Sdn Bhd | Fabrication works of 12 units of service station for GMSB | 11 T |
June 2010 | BCI Engineering,USA | Fabrication works of spillage chutes, dust drum, dust hood dedusting plates, hearth layer sidewall layer system | 21.82 T |
May 2010 | Vosta LMG BV Amsterdam | Extra steel parts Exhaust Gas Elbow Piece Extra steel parts Penetrations Hydraulic System |
2 sets 2 sets |
May 2010 | BCI Engineering,USA | Machining of Drive Wheel Tipping Wheel, Bearing Cap | |
April 2010 | Vosta LMG BV Amsterdam | Pedestal Extension of 1600mm x 2100mm and Spacers | 2 pcs |
April 2010 | Vosta LMG BV Amsterdam | Coupling Block Arrangement Coupling Block 1 x manuf 2 times Coupling Block 2 x manuf 4 times Coupling Block 3 x maunf 2 times | 7.14 T |
April 2010 | Emerson Process Management, Singapore | Fabrication & Modification works of F1000 & F2000 stations at Kluang, P.Indah, Kamunting | 7.5 T |
March 2010 | Baggerwerken Decloedt | DECK: Suction mouth to GANGA (BDC) - 1 pc and ENG:Side Wire Block to GANGA (BDC) - 1 pc | 4.3 T |
March 2010 | Impsa (Malaysia) S/B | Machining Process- Regulating Ring, Supplement Ring, Bottom Ring and DischargeRing | 35.4 T |
March 2010 | HATCH Ltd Canada | Supply fabrication, surface treatment and completion FCA river side wharf of Furnace Steel Work- Steel for Koniambo Project at New Caledonia | 140 T |
February 2010 | TCM Corporation, JAPAN | Manufacturing of 5 units Rubber Tired Gantry (RTG) Cranes for North Port, Malaysia. | 392 T 5 units |
February 2010 | BCI Engineering,USA | Fabrication of 1 unit Iron Ore Indurating Machine consisting Drive Wheel, Tipping wheel and Main Drive (Single drive) for JSW Project | 142 T |
February 2010 | Tech Infinity Engr Sdn Bhd | Fabrication & Modification works for EPCC of Tanjung Langsat City Gate Station Project | 30 T |
February 2010 | Tech Infinity Engr Sdn Bhd | Fabrication works of 2 (two) sets of RDS-ODG and 2 (two) sets of ANPG-A USM Pipe Modification | 3 T |
January 10 | Petrochemical & Power Plant Services S/B | Off-Gas Duct Fabrication Work (complete Lot-2 ducts) | 702 T |
2009
# | Client | Project Description | Quantity |
---|---|---|---|
December 2009 | HATCH Ltd Canada | Supply fabrication Hold Down Ring Beams & Roof Dome Skew Rings for Koniambo Project at New Caledonia | 116 T |
November 2009 | Dialog Plant Services Sdn Bhd | Farication works for Temporary Pipe Spool includes delivery to Dialog / PP(M)SB Project site | 3000" dia inch |
October 2009 | Dialog Plant Services Sdn Bhd | Fabrication works for Test Blind and Spade for Package B1 & B2 included delivery for MRC PSR-2 Revamp project, Melaka | |
September 2009 | Vosta LMG BV Amsterdam | Dredge Equipment for ship set 2008.0.1122 & 2008.0.1123 to Inai Kiara, Malaysia. | 472 T |
September 2009 | Vosta LMG BV Amsterdam | Delivery and services for Construction of CSD500 to Amman, Jordan. | 132 T |
September 2009 | BCI Engineering,USA | Fabrication of 1 unit Ore Indurating Machine consisting Drive wheel, Tipping wheel and Main drive for Essar Project, India | 240 T |
September 2009 | Impsa (Malaysia) S/B | Machining Process- Bottom Ring and Discharge Ring | 3 T |
August 2009 | Saga Dialog Sdn Bhd | Fabrication, Erection & pre-commissioning of Pipe works at FO site for EPCC f Tg Langsat Terminal 1 at the Port of Tanjung Langsat, Johor. | 36 T 60,000 dia inch |
July 2009 | Alstom K.K., JAPAN | Fabrication of Ljungstrom Air Preheater for PAITON Expansion Project, Indonesia - 2 sets, 1 boiler | 464.2 T |
June 2009 | Dialog Plant Services Sdn Bhd | Supply, Fabrication, testing/inspection and delivery of 2 units utility air receiver and 4 units of pig launcher/receivers for EPCC of Langsat Terminal One at the port of Tanjung Langsat, Johor | |
June 2009 | Howden UK Limited, Belfast, North Ireland | Manufacture of Axial Static Parts for Coronado 2 Project, USA – 2 sets | 100 T |
April 2009 | HATCH Ltd Canada | Supply & Fabrication of PS001A – 2 sets Bottom Support Rings including receipt, storage and installation for Koniambo Project at New Caledonia | 550 T |
March 2009 | Alstom Hydro Malaysia S/B | Supply, Manufacturing and Delivery of Dilatation Piece Monitoring Parts for Bakun Hydroelectric Project-Turbine | 0.5 T |
March 2009 | Howden UK Limited, Belfast, North Ireland | Manufacture of Axial Fan Static assemblies for Sandy Creek site, USA – 2 sets | 99 T (49.5T each) |
February 2009 | Dialog Plant Services Sdn Bhd | Supply, Fabrication, testing/ inspection and delivery of utility air receiver, pig launcher/ receivers for EPCC of Langsat Terminal One and Langsat CTF at the port of Tanjung Langsat, Johor | |
January 2009 | Itramas Technology Sdn Bhd | Supply, Fabrication & Installation PLUS III VMS Full Gantry | |
January 2009 | IHI CO Ltd | SCPP Measuring Tape for Air Duct & Gas Duct | 8.19 T |
2008
# | Client | Project Description | Quantity |
---|---|---|---|
December 2008 | Misi Setia Oil & Gas Sdn Bhd | Additional Pipe Prefabrication (Off-Site) Carbon Steel for the Melaka Refinery PSR-2 Revamp Project Sungai Udang, Melaka, Malaysia | |
December 2008 | TCM Corporation, JAPAN | Manufacturing of 5 units Rubber Tired Gantry (RTG) Cranes for North Port, Malaysia. | 392 T 5 units |
October 2008 | Petrochemical & Power Plant Services S/B | Off-Gas Duct Fabrication Works (FOB- Expansion Vent Ducts) (Line 1 & 2) | 65 T |
October 2008 | Tech Infinity Engr Sdn Bhd | Fabrication works for Murphy Sarawak Gas Development Project GOPA & GOPB Gas Skids and GOPA Condense skids | 15 T |
October 2008 | ALSTOM Hydro (Switzerland) Ltd | Fabrication & Supply of Hatch Cover compl + Hatch Frame compl 1) Unit 1 & 2 – 23 Feb 09 2) Unit 3 & 4 – 22 June 09 |
141.6 T (35.4 T each) |
October 2008 | Vosta LMG BV Amsterdam | Delivery of Cutterladder 1) VOSTA LMG – 7 Sept 2009 2) ASL Shipyard – 7 Sept 2010 |
1500 T (750 T each) |
September 2008 | Isolectra (M) Sdn Bhd | VMS Gantry Structure for Karak Highway | 7.5 T |
September 2008 | Vosta LMG BV Amsterdam | Suction plate 44 x 53 MHD 105DW Dredge Pump | |
August 2008 | Howden UK Limited, Belfast, North Ireland | Manufacture at Axial Fan Static Parts for JW TURK Project (Left & Right) to USA | 89.77 T |
August 2008 | Vosta LMG BV Amsterdam | Delivery of gantries, hopper unloading, Trailing pipes for 4500 M3 Split Hopper Dredge – 3 sets | 390 T |
August 2008 | Vosta LMG BV Amsterdam | Delivery of components & services for assembly of CSD 600 | 449 T |
August 2008 | Dialog Fabricators Sdn Bhd | Supply & Delivery of 2 units Book End Suppors for One Naphta Stripper Column for Melaka Refinery PSR-2 Revamp PJ | 2 units |
July 2008 | Itramas Technology Sdn Bhd | Supply, Fabricate, Delivery to site Installation of Gantry & Mounting of VMS Panel for Duta Ulu Kelang | 36 T |
June 2008 | Dialog Fabricators Sdn Bhd | Fabrication works for Design, Engr, Fabrication & Supply of Large Diameter Piping & Fittings for Flare & Cooling Water for Shell Eastern Petroleum S/B | 300 T |
June 2008 | Alstom K.K., Japan | Fabrication of Ljungstrom Air Preheater for Tanjung Jati B Expansion Project TJB 3&4 1) Unit 3- Apr 09- 2 sets 2) Unit 4- July 09- 2 sets |
748 T |
June 2008 | Tech Infinity Engr Sdn Bhd | Fabrication work for the GMSB Top Glove 4 Service station modification works | 1.5 tons |
June 2008 | Dialog Otec Sdn Bhd | Vessel Fabrication Work for Suction Scrubber (V-2420) & Interstage Suction Scrubber (V2430) for BII Redevelopment Project for Sarawak Shell Berhad | 130 tons |
June 2008 | Dialog Fabricators Sdn Bhd | Piping Prefabrication (Offsite) Exotic for the Melaka Refinery PSR-2 Revamp Project | 2000 T 26,000” dia inch |
May 2008 | Macglotech Steel Service S/B | Aneealing Steel Rack ; Material: SUS 304 | 8 units |
May 2008 | Translift Sdn Bhd | Fabricate & Install 1) 600m3 Vertical Storage Tank T601 2) 30m3 Blending Tank M6 3) 30m3 Blending Tank M7 4) 3m3 Dilution Tank 03 | 38 T |
May 2008 | Negeri Sembilan Cement Ind. S/B, Perlis | 2 Girth Gear Reversing & Shell Section Renewal Works | |
April 2008 | Transwater API Sdn Bhd | Fabrication works of PDLP-A Serial #255 Accuflow Multiphase Metering Syatem | 6 T ; 340" dia inch |
March 2008 | Impsa (Malaysia) S/B | Machining Stay Ring 1,2,3 | 1 unit |
March 2008 | TCM Corporation, JAPAN | Manufacturing of 8 units Rubber Tired Gantry (RTG) Cranes for North Port, Malaysia. | 627 T 8 units |
March 2008 | Tech Infinity Engr Sdn Bhd | Fabrication works for the Murphy Metering Skid | 20 T |
February 2008 | Malaysia Transformer Manufacturing S/B | Fabrication Tank, Cover & C/Clamp 15 MVA 64dB including full welding tank complete with core clamp | 10 units |
February 2008 | Transwater API Sdn Bhd | Fabrication works of PDLP-A Serial #255 Accuflow Multiphase Metering Syatem | 10 T |
February 2008 | Transwater API Sdn Bhd | Fabrication works of PSCB-BETTY Serial #249 Accuflow Multiphase Metering System | 1000" dia inch |
February 2008 | Vosta LMG BV Amsterdam | Contruction, Manufacturing, Service and Delivery of Spud Carrier CSD 650 | 52 T |
February 2008 | FLSmidth MVT Gmbh, Germany | Manufacture of Mobile Crusher for ISPM Australia | 1336 T |
February 2008 | Alstom Hydro Malaysia S/B | Manufacture of Turbine Dilatation Piece for Bakun Hydroelectric Project- Turbine, MALAYSIA | 123 T |
January 2008 | Transwater API Sdn Bhd | Accuflow PDLP- FWSS 256 Fabrication works | 800" dia inch |
January 2008 | Howden UK Limited, Belfast, North Ireland | Manufacture of 4 sets at Axial Fan Static Parts for IATAN ID Project (2Left and 2 Right) to USA | 162 T |
January 2008 | JGC Corporation, Yokohama | SMDS Upgrading Project Platform and Ladder | 11 T |
January 2008 | Vosta LMG BV Amsterdam | Fabrication of Ljungstrom Air Preheater for Cairo West Project, USA- 4sets/ 2 boilers | 590 T |
January 2008 | Alstom K.K., JAPAN | Construction and delivery of components and services of a cutter section dredger CSD 750S (Mono Hull) for GANGA | 770 T |
2007
# | Client | Project Description | Quantity |
---|---|---|---|
December 2007 | Paras Resources Sdn Bhd | Fabrication & Modification works of PICC Metering Station, Wisma Putra Metering Station, Putrajaya I Metering station, Tronoh & PDH | |
November 2007 | Vosta LMG BV, The Netherland | Bottom Door 2340 x 6320, CIF Dubai UAE | 15 T |
November 2007 | Megasteel Sdn Bhd | Fabricate & Delivery of 1 unit 20,000 liters compact storage tank for CSP Upgrading project Megasteel | 2 T |
November 2007 | INCO Australia Mgmt Pte Ltd | Special piping Items & Rubber Line Pipe & Fittings | |
November 2007 | OilFab Sdn Bhd | Topsides Mian Support Can | |
November 2007 | Dialog E & C Sdn Bhd | Supply, Fabrication, Erection and Painting of Structural Steel Works for External Common Piperack Project at Tanjung Langsat Port, Johor, Malaysia. | 700 T |
October 2007 | IHI Corporation Japan | PPPP (USA) Misc Piping | 115 T |
October 2007 | IHI Corporation Japan | Miscellaneous Piping for Bluewater Power Station Unit 2 Project | 207 T |
September 2007 | JGC Corporation, Yokohama | Supply of Shop Fabricated Structural Steel (HPS Plant) Sarawak | 11.9 T |
September 2007 | Transwater API Sdn Bhd | Supply, Fabrication and Manufacturing of Roller Station 1 & 2 for the TEXFA-2 Project to USA | 116 T |
August 2007 | Transwater API Sdn Bhd | Accuflow Multiphase Metering Skid Fabrication | |
August 2007 | Vosta LMG BV, The Netherland | Construction, manufacturing, services and delivery of the bottom door system, overflow pipe, bow coupling installation sliding piece and trailing suction pipe. | 90 T |
August 2007 | Howden UK Limited, Belfast, North Ireland | Manufacture of Axial Fan Static Parts for the COFFEEN # 2 project (Left & Right parts) to USA | 107 T |
August 2007 | IHI CO Ltd | BLUEWATERS Misc Piping PJ 1)Prefab Piping 2) Site Run Piping |
207 T |
July 2007 | Transwater API Sdn Bhd | Fabrication of KIKEH Gas Skids for Petronas Carigali on Methanol Plant, Sabah | 25 T |
July 2007 | Vosta LMG BV, The Netherland | Fabrication & Delivery of Spud complete 27,000mm x 800mm uncluding spud point | 18 T |
July 2007 | Transwater API Sdn Bhd | Fabrication of Fuel Gas Skids Fabrication of Feed Gas Skids | 25 T |
July 2007 | PT-Sempec IJM Torsco S/B | Rolling & Welding of Jacket Legs & Bracings for Heera Redevelopment Project | |
July 2007 | Amsteel Mills Sdn Bhd | To Supply Labour, Material, Consumables, Tools And Equipment To Fabricate Three (3) Units of Shore Crane Pedestals Including Site Erection And Welding For The Crane Foundation For Jetty / River Project, Banting, Selangor, Malaysia. | 108 T |
July 2007 | Polysius Engineering Sdn Bhd | Supply & Fabrication of plateworks for the AMERAFA, USA | 88 T |
June 2007 | Yun Yang Temple (Australia) Inc | Fabricating, Galvanizing, Painting of the Main Shrine Structures & delivery to Melbourne port | 70 T |
June 2007 | IHI CO Ltd | Manufacturing & Supply of Measuring Tape | 15 T |
May 2007 | LION Diversified Holdings S/B | Supply materials, fabrications, painting and delivery of Mani Flow Structure for DRI Plant Banting | 90 T |
May 2007 | Itramas Technology Sdn Bhd | Supply, deliver, install of VMS Gantry, mounting brackets & install of complete VMS panel at site | 5 nos |
April 2007 | Dialog Otec Sdn Bhd | Fabrication works for piping and pipe supports inclusive of hydrotest works for large diameter piping and special fittings for Project 04217 Shell ECC Singapore | 517 T |
April 2007 | LION Diversified Holdings S/B | Manufacturing & Erection for Main Control Building Cable Tray Support at DRI Project Banting, Selangor D.E. | 1 Lot |
April 2007 | Emerson Process Management, Singapore | Fabrication of Pipe Spools, Structural Base and Supports | |
April 2007 | ISHI Power Sdn Bhd | Fabrication of Boiler Drip Pan Unit 1 & 2 to Jimah Power Plant, N. Sembilan | 19 T |
March 2007 | VA Tech Holdings (M) Sdn Bhd | Manufacture, Supply and Deliver to Site Vertical Entry and Exit Looper Steel Structure for Cold Rolled at Mycron Steel CRC Sdn Bhd. | 200 T |
March 2007 | Megasteel Sdn Bhd | Fabrication, Machining Tread and delivery for Edge Masking | 12.5 T |
March 2007 | Vosta LMG, Holland | Elevation Anchor Platform - VO 1)Off Shell Halves 2) Off Hinges |
12 pcs; 12 pcs |
March 2007 | VA Tech Holdings (M) Sdn Bhd | Manufacture, Supply and Deliver to Site Vertical Entry and Exit Looper Steel Structure for Cold Rolled at Mycron Steel CRC Sdn Bhd. | 200 T |
February 2007 | JGC Corporation, Yokohama | SGP Prefurn Project - Supply of Shop Fabricated Structural Steel to Bintulu, Sarawak | 342 T |
February 2007 | JGC Corporation, Yokohama | SGP Prefurn Project - Equipment Platform & Ladder to Bintulu, Sarawak | 5.3 T |
February 2007 | CTP PNG Ltd, Higaturu | Supply materials, fabrications and services for FFB Bins | 98 T |
January 2007 | Transwater API Sdn Bhd | Fabrication works of Newfield Block PM323 Development Project | 1000" dia inch |
January 2007 | IHC Holland NV, Singapore | Fabrication and delivery of Gantry Structure for Marine Dredges – FOB Port Klang | 340 T |
January 2007 | OilFab Sdn Bhd | Project Provision of Engineering, Procurement, Contruction of Topsides for Chermingat Platform | 5000" dia inch |
January 2007 | OilFab Sdn Bhd | Detailed Engineering design of Looper Structure | |
January 2007 | Alstom K.K., Japan | To manufacture, inspect, test and shipment of Ljungstrom Air-Preheater for Jimah Project in Malaysia | 4 sets/ 2 boilers |
2006
# | Client | Project Description | Quantity |
---|---|---|---|
December 2006 | INCO Australia Mgmt Pte Ltd | 1) Supply and Delivery of Launders and Chutes for GORO-Nickel Project. Australia. | 70 T |
November 2006 | ISHI Power Sdn Bhd | Prefabrication works of Miscellaneous Piping for 2x700MW Coal Fired Power Plant, Jimah, Negeri Sembilan | 1365 T |
November 2006 | Dialog Plant Services Sdn Bhd | Construction package during PSR-1 Turnaround – PESD Project at Petronas Penapisan Melaka including fabrication and installation at piping, pipe support and statics equipment | 6850 “ dia inch |
October 2006 | Kemuning Engineering Sdn Bhd | Manufacturing, services and delivery of the construction of the lost parts of the dredge for Namdeb Diamond Corporation Ltd., Namibia. | 54 T |
September 2006 | LION Diversified Holdings S/B | Supply & Delivery of Material, labour, tools & equipment for the fabrication and riser pipes for Combustion Air Ducts at DRI Plants Project. | |
August 2006 | Itramas Technology Sdn Bhd | Modify, Refurbish, Construct & Install of Existing Full Gantry Structure for VMS display panel at Elite Sites | |
August 2006 | Sumatec Corporation S/B | Fabrication of Steel Structure Works for PML Mega Methanol Project in Island of Labuan, Malaysia. | 3799 T |
August 2006 | Leong Jin Corporation Pte Ltd | Manufacturing of Apart 1/Part 2/3-Storey Single User, Single Occupier Factory with Ancillary Office on Lot No:3970CPT MK 06 at Pioneer Walk for M/S Leong Jin Corp Pte Ltd | 308T |
August 2006 | IMPSA (Malaysia) Sdn Bhd | Fabrication of Spiral Case and upper and lower part of Stay Ring for Unit 1, 2 and 3 for the Bakun Hydroelectric Project- Turbine, Sarawak, Malaysia. | 600T |
August 2006 | LION Diversified Holdings S/B | Supply and Delivery of GI Grating for the Walkway and Stair Treads for DRI Project | 240 T |
August 2006 | Niron Staal, Amsterdam/ Vosta LMG | Fabrication and Supply of Spud Carriers | |
August 2006 | LION Diversified Holdings S/B | Fabrication of Flanges an Rings to DRI Project Plant | |
August 2006 | Transwater API Sdn Bhd | TEPCC of the service station SS/F/DR Phase 4’06 (1 unit) | |
August 2006 | LION Diversified Holdings S/B | Supply labour, equipment, scaffolding, consumables, tools & temporay steel to complete the erection of Reduction Furnace for DRI Plant at Banting, Selangor | |
August 2006 | Alstom Hydro Malaysia Sdn Bhd | Thrust Bearing Housing Partial Assembly P40 for the Bakun Hydroelectric Project- Turbine, Sarawak, Malaysia | 56 T |
July 2006 | Alstom K.K., Japan | Fabrication of Ljungstrom Air Preheater for Toso Project | 141 T |
June 2006 | Alstom K.K., Japan | Fabrication of Ljungstrom Air Preheater for Blue Water Project | 139 T |
June 2006 | LION Diversified Holdings S/B | Fabrication and Delivery of Stainless Steel Feed Gas Duct Riser Pipe for HDRI/HBI Plant at Banting, Selangor. | 1 Lot |
May 2006 | ISHI Power Sdn Bhd | Fabrication and Delivery of Boiler Steel Structure (Columns & Girders) for Project 2 x 700MW Coal Fired Power Plant, Jimah Power Plant, N. Sembilan | 1825 T 1260 T |
March 2006 | JGC Corporation, Yokohama | HAWIYAH NGL Project- Circular Platform and Ladder | 160 T |
February 2006 | Two YSP Marketing & Trading | Fabrication 8 nos of Pipe Clamp - 1.5m x 24” x 16” | |
February 2006 | JGC Corporation, Yokohama | OLEFIN Plant Project- Circular Platform and Ladder | 450T |
February 2006 | Transwater API Sdn Bhd | Supply, delivery, installation and Commissioning of Service Station + 25 units of D 500series station + F1000 one (1) unit and F 10000 One (1) unit | |
February 2006 | Vosta LMG, Holland | Construction of CSD550S Dredger- Booler for Namdeb, Namibia | 156 Ton |
January 2006 | Oil Line Engineering & Associate Sdn. Bhd. | Fabrication of 5 nos Suction Anchors for KIKEH Field Subsea Project-2187-C-0017 | 220 T |
January 2006 | Lafarge Malayan Cement Sdn Bhd | KW/T107/2005-Fabrication of KK3 Kiln Shell Replacement - To supply material for fabricating kiln shell section with dimension of 22,010mm length & I.D. 4200mm | 78 T |
January 2006 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing, Painting & Commissioning EPCC of Kulim Hi-Tech Park City Gate Station | 20 T; 1000” dia inch |
2005
# | Client | Project Description | Quantity |
---|---|---|---|
December 2005 | IHC Holland NV, Singapore | To supply draghead gantry consists of fixed part, futtock, cover 580x05, ring 508/300,o-ring, tap bolt, strip & etc | 34 T |
December 2005 | VAMH/DSA, Germany | Supply of Steelwork & Mechanical Components and pre assembling for one(1) Stacker without Long Travel Arrangement | 34 T |
December 2005 | Transwater API Sdn Bhd | Ledang –Anoa Metering Skids: Procurement, Fabrication, Testing, Painting & Installation of one (1) no Condensate Metering Skids, one (1) no of Gas Metering Skid and one (1) of Gas Sampling Skid | 10 T; 600” dia inch |
November 2005 | LION Diversified Holdings S/B | Fabrication, erection & installation of structural steel for furnace ,duct bridge, reformer, heat recovery area & piperacks for 1.5 mil ton project at Lot 19319, Kwas Perin. Olak Lempit, Banting. | 5400 T |
November 2005 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing, Painting, Installation & Commissioning of Plentong Metering Station II project. | 80 T; 5000” dia inch |
October 2005 | Transwater API Sdn Bhd | EPCC of Pinang Tunggal, Sungai Petani City Gate Stationa | 20T; 2500” dia inch |
October 2005 | Two YSP Marketing & Trading | Repair of composite sleeve for Petronas Carigali S/B- Sarawak Operations | 1 units |
October 2005 | Impsa (Malaysia) S/B | Fabrication of 3 units of Draft Tube Elbow for Bakun Hydroelectric Project | 240 T |
August 2005 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing, Painting & Commissioning of Service Station F-series Phase 7 ’05 (14 nos of F-skids, 3 nos of filters, 4 nos of F-skids(add), 4 nos of D500 ) | 30 T; 10,000” dia inch |
July 2005 | Alstom K.K., Japan | Piping Works for Ljungstrom Air Preheater for Tanjung Bin Project | 15 T |
June 2005 | Vantage Construction Sdn Bhd | To supply and fabricate complete Tromel Screen and To Section c/w pathway | 1 unit |
June 2005 | IHC Holland NV, Singapore | Fabrication and Supply of 2 Overflow trunks, 1 portside, 1 starboard | 2 unit |
June 2005 | Vosta-LMG Dredging Technology, Amsterdam | Construction, Delivery ex-works 2 units Anchor Elevation Platform | 548 T |
May 2005 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing, Painting & Commissioning of Service Station F-series and D-series (23 nos of D-skids, 25 nos of F-skids & 43 nos of Filters | 60 T; 14,000” dia inch |
May 2005 | IHC Holland NV, Singapore | Fabrication and Supply of IHC Draghead D=1200(Schelde Visor” type | 5 T |
April 2005 | Itramas Technology Sdn Bhd | Procurement, Fabrication, Painting and Installation of 8 nos of IT IS Signborad Gantry for Butterworth- Kulim Expressway | 15 T |
March 05 | ISHI Power Sdn Bhd | Fabrication of Boiler Drip Pan to Tanjung Bin MW Coal Fired Power Plant at Tg Bin. Johor -84 units | 32 T |
March 2005 | IHC Holland NV, Singapore | Fabrication and Supply of IHC Draghead D900mm | |
March 2005 | Okuma Sdn Bhd | 2100 mm O/Dia Clutch Door -15mm A516 Gr 70 -6mm ms dished end half liner SUS groove insert | 8 pcs |
March 2005 | Okuma Sdn Bhd | 2100 mm O/Dia Clutch Door -15mm A516 Gr 70 -6mm ms dished end half liner SUS groove insert | 8 pcs |
March 2005 | Okuma Sdn Bhd | 2100 mm O/Dia Clutch Door -15mm A516 Gr 70 -6mm ms dished end half liner SUS groove insert | 8 pcs |
March 2005 | Okuma Sdn Bhd | 2100 mm O/Dia Clutch Door -15mm A516 Gr 70 -6mm ms dished end half liner SUS groove insert | 8 pcs |
March 2005 | Okuma Sdn Bhd | 2100 mm O/Dia Clutch Door -15mm A516 Gr 70 -6mm ms dished end half liner SUS groove insert | 8 pcs |
February 05 | Giant Shield Engr Sdn Bhd | To fabricate, erect/construct, supply/deliver and install a new complete set of working essential oil distillation systems at MARDI, Kuala Linggi, Melaka | 1 Lot |
January 05 | JGC Corporation, Yokohama | Circular Type Platform and Ladder for Equipment at Ras Laffan, Qatar for Dolphin Project | 618 T |
January 05 | Transwater API Sdn Bhd | Fabrication Works for MRS (Rev1) EPCC of GSMB SS/F/DR Phase 13-20 ’04 F-Series (28 nos of Skids & 60 nos of Filters) | 40T; 10,000” dia inch |
January 05 | Amsteel Mills Sdn Bhd | Fabrication Job for Scrap Bucket for Amsteel 2 EAF Modification Project | 75T |
2004
# | Client | Project Description | Quantity |
---|---|---|---|
December 04 | Amsteel Mills Sdn Bhd/td> | Fabrication Job of Rocker and Turning Column for Amsteel 2 EAF Modification Project | 132 T |
December 04 | Amsteel Mills Sdn Bhd | Fabrication of 2 units Furnace Lower Shell for EAF Modification Project | 60 T |
December 04 | IHC Holland NV, Singapore | Fabrication of Draghead D-810mm for Vessel “ GORYO 6 HO” | 2T |
November 04 | Polysius Engineering Sdn Bhd | Supply and Fabrication of Platework for BOUSKOUVER Project | 211 T |
November 04 | ISHI Power Sdn Bhd | Fabrication and Delivery of Miscellaneous Piping for 3x700Mw Coal Fired Power Plant, Tanjung Bin, Johor | |
October 04 | DSA GmbH,Germany | C 477- Blackwater Supply of steel work and mechanical for two stacker without long travel drive | 2 units |
October 04 | AIkhlas Kekal Sdn. Bhd. | CSD 500 Dredger- Fabrication, painting, assembly,(excluding Launching) of completed dredge, Installation of clients’ equipment. Exclude Hydraulic) inclusive electrical equipment and wiring | 220 T |
September 04 | Alstom Power Asia Pacific S/B | Bakun Hydroelectric Project- Turbine Work Package: Stay Ring & Spiral Case. Supply of material, fabrication, painting & coating, welding electrodes, consumable, tools | 636 T |
September 04 | Algotech (M) Sdn Bhd | Fabrication and Installation of O-Xytelen Buffer Tank and Associate Piping System (3 nos of tanks) | 20T; 1000” dia inch |
September 04 | Prestasi Yakin Jaya Sdn Bhd | Fabrication and Erection of Structural Steel for Proposed Wet and Dry Screening and Coating System for DRI Plant at Perwaja Steel, Kemaman, Terengganu | 1 Lot |
September 04 | CV Tribina Usaha Mandiri, Medan Indonesia | 2700mm O/dia Clutch Door-4 nos SUS Ring + 45htk Dish End Half Liner | |
September 04 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing, Painting & Commissioning of Service Station F-series (6 nos of skids-change order), D-series (2 nos of skids- change order) | 25 T; 3000” Dia inch |
August 04 | Algotech (M) Sdn Bhd | Provision of supervision, manpower, equipment tools & equipment to fabricate and install 1 lot of piping & pipe support work for N-Butane Project | 8 T; 13,500” Dia inch |
August 04 | ISHI Power Sdn Bhd | Supply, fabricate & deliver Duct support structure, Piperack structure & stair tower structure to the 3x700MW Coal Fired Power Plant at Tanjung Bin, Johor | 2107 T |
August 04 | Megasteel Sdn Bhd | EAF Upgrading Project To fabricate 2 units of round type scrap bucket ( including all accessories) for EAF 1 as work unit |
2 units |
August 04 | Megasteel Sdn Bhd | EAF Upgrading Project To fabricate 2 units of round type scrap bucket ( including all accessories) for EAF 1 as work unit |
2 units |
August 04 | Stork Technology Services Sdn Bhd | Fabrication of Base Rings; 1) Type C Base Ring 2) Type D Base Ring |
2 pcs 1 pc |
August 04 | Dialog Plant Services Sdn Bhd | PM south Ansi A – Deoiller and Degasser Skid | 20T; 1300” dia inch |
August 04 | Polysius Engineering Sdn Bhd | Yamaver 5- Mill 6 & 8 –Bearing Housing | |
July 04 | Saga Dialog Sdn Bhd | Piping Installation Works for Petronas Fertiliser (Kedah) S/B | 20T; 25,000” Dia inch |
July 04 | Malaysia Transformer Manufacturing S/B | TRe: Transformer Tank & Cover To fabricate full welding tank and cover with shot blasting for 15 MVA & 7.5 MVA33/11 Kv Complete with core clamp and Accessories |
7 sets 3 units |
July 04 | Transwater API Sdn Bhd | Fabrication works of one(10 no of F1000 Ansi 600# skid & 1 no activated carbon filter demo unit & installation to adorant vessel | 2 |
June 04 | Prestasi Yakin Jaya Sdn Bhd | Perwaja- Shutdown works including Civil and Structural Works | |
June 04 | Amsteel Mills Sdn Bhd | Supply of manpower, materials and necessary tools & equipments to Fabricate and Machining of Cross Transfer Car Rake (32 and 25 teeths) and Hardening (34 pcs) | 36M |
June 2004 | Prestasi Yakin Jaya Sdn Bhd | Perwaja Steel- 20 tons Wharf Crane Refurbishment Work include repair and blasting /painting | 1 Lots |
June 2004 | RB Project Resources Sdn Bhd | -To supply labour to mark, cut and equipment to roll plates 70mm thk to 7000mm I/Dia | |
June 2004 | RB Project Resources Sdn Bhd | For rolling works -To supply labour to mark, cut and equipment to roll plates 35mm thk to 7000mm I/Dia |
1 | June 2004 | RB Project Resources Sdn Bhd | For rolling works -To supply labour to mark, cut and equipment to roll plates 35mm thk to 7000mm I/Dia |
1 |
June 2004 | Transwater API Sdn Bhd | Piping fabrication and installation works for the skids at EPCC of the service station SS/F/DR Phase 8’03 and1’02 | 6 |
June 2004 | Lafarge Malayan Cement Sdn Bhd | To supply labour, tools and equipment to carry out KK3 Preheater and Cyclone repairs and services | 1 |
May 2004 | Megasteel Sdn Bhd | EAF Upgrading Project To fabricate 2 units of round type scrap bucket ( including all accessories) for EAF 1 as work unit |
2 |
May 2004 | Megasteel Sdn Bhd | EAF Upgrading Project To fabricate 2 units of round type scrap bucket ( including all accessories) for EAF 1 as work unit |
2 |
April 2004 | Malaysia Transformer Manufacturing S/B | Fabrication of Transformer Tanks 15Mva 33/11kV | 2 units |
April 2004 | Vantage Construction Sdn Bhd | Fabrication of top and bottom blind section complete with pathways | |
April 2004 | Prestasi Yakin Jaya Sdn Bhd | Perwaja- Unloader Crane Refurbishment Work Include repair, blasting and painting | |
April 2004 | Polysius Engineering Sdn Bhd | Supply and Fabrication of Platework for RIVERCOM Project | 55 T |
April 2004 | Polysius Engineering Sdn Bhd | Supply and Fabrication of Platework for EASTVER Project | 33 T |
April 2004 | Transwater API Sdn Bhd | Piping fabrication and Installation Works for the Skids at EPCC of the service station SS/F/DR Phase 8 ‘03 | 44T; 10,000” Dia inch |
April 2004 | Transwater API Sdn Bhd | Procurement, Fabrication and Installation and Commissioning of HP Natural Gas Extention Line from TPP1 to TPP2 | 2T; 900” Dia inch |
April 2004 | MHI/ Transwater API Sdn Bhd | Procurement, Fabrication and Testing of 5 nos of Liquid Petroleum Gas Mass Flow Metering Skids for GPP1, ET1 & ET2 | 50 T; 1200” Dia inch |
April 2004 | Alstom K.K., Japan | Ljungstrom Air Preheater for Tanjung Bin Project | 430 T |
April 2004 | Lafarge Malayan Cement Sdn Bhd | To supply labour, tools, material, fabricate and install the whole sectionof KK3 Clay Rotary Dryer Shell | 1 unit |
April 2004 | Malaysia Transformer Manufacturing S/B | Fabrication of Transformer 30Mva 132kV | 2 units |
March 2004 | Oil Line Engineering & Associate Sdn. Bhd. | Provision of construction and relocation of facilities affected by LRC closure (Phase 2) at Miri Crude Oil Terminal (MCOT | 10,000” Dia inch |
March 2004 | Itramas Technology Sdn Bhd | To supply , fabrication and installation of signboard gantry VMS for PLUS phase 2 To supply , fabrication and installation of signboard : 1) gantry cantilever for 250mm panel 2) gantry cantilever for 350mm panel |
10 10 |
March 2004 | Itramas Technology Sdn Bhd | To supply , fabrication and installation of signboard gantry VMS for PLUS phase 2 To supply , fabrication and installation of signboard : 1) gantry cantilever for 250mm panel 2) gantry cantilever for 350mm panel |
10 10 |
March 2004 | Itramas Technology Sdn Bhd | To supply , fabrication and installation of signboard gantry VMS for PLUS phase 2 To supply , fabrication and installation of signboard : 1) gantry cantilever for 250mm panel 2) gantry cantilever for 350mm panel |
10 10 |
March 2004 | Itramas Technology Sdn Bhd | To supply , fabrication and installation of signboard gantry VMS for PLUS phase 2 To supply , fabrication and installation of signboard : 1) gantry cantilever for 250mm panel 2) gantry cantilever for 350mm panel |
10 10 |
March 2004 | Zanwa Sdn Bhd | Supply and Fabrication of 1) 30MVA 132kv Power Steel Parts Transforme 2) 30MVA 132kv Power Transformer Steel Parts |
|
March 2004 | Polysius Engineering Sdn Bhd | Supply and Fabrication of platework for the codeword Eastver | 243 T |
February 2004 | JGC Corporation, Yokohama | Supply and manufacturing of platforms including gratings for Sohar Refinery Project | 456 T |
February 2004 | Transwater API Sdn Bhd | To provide supervision, labour, equipment/tools and other necessary try for construction and completion of piping pre-fabrication works as well as site installation works and assisting site acceptance test. | 1 Lot |
January 2004 | Polysius Engineering Sdn Bhd | Supply and Fabrication of 1 unit dia 4.6 x 70m long Kiln Shell for Eastver Project | 253 T |
January 2004 | Transwater API Sdn Bhd | To provide supervision, labour, equipment and other for supply materials, fabrication, construction, completion and installation of Plentong city gate piping and mechanical works. | 30 T 1 Lot |
2003
# | Client | Project Description | Quantity |
---|---|---|---|
December 2003 | Zanwa Sdn Bhd | Supply and Fabrication of 1) 30MVA 132kv Power Steel Parts Transformer 2) 30MVA 132kv Power Transformer Steel Parts |
1 1 |
December 2003 | Zanwa Sdn Bhd | Supply and Fabrication of 1) 30MVA 132kv Power Steel Parts Transformer 2) 30MVA 132kv Power Transformer Steel Parts |
1 1 |
December 2003 | Zanwa Sdn Bhd | Supply and Fabrication of 1) 30MVA 132kv Power Steel Parts Transformer 2) 30MVA 132kv Power Transformer Steel Parts |
1 1 |
December 2003 | Itramas Technology Sdn Bhd | VMS signboard full gantry VMS signboard cantilever |
1 4 |
December 2003 | Itramas Technology Sdn Bhd | VMS signboard full gantry VMS signboard cantilever |
1 4 |
December 2003 | Itramas Technology Sdn Bhd | VMS signboard full gantry VMS signboard cantilever |
1 4 |
October 2003 | Transwater API Sdn Bhd | Gas Metering Station. To provide technical assistance, supervision, labour, equipment/ tools and other necessary try for completion of piping pre- fabrication works and assisting site acceptance test. | 1 Lot |
August 2003 | Piping fabrication and installation works for the skids- Rev1 | 1 Lot each | |
August 2003 | EPCC of the servic station SS/F5000 & SS/F3000Phase 1 ’02 at 1) Matsushita, Shah Alam 2) Pan Century, Pasir Gudang |
1 Lot each | |
August 2003 | Oil Line Engineering & Associate Sdn. Bhd. | To supply of temporary materials, labour , equipment, facilities, consumables, NDT for stack liner fabrication and erection at job site Kerteh) for 1 unit of stack fabrication work, repair work for burner / Incinerator & Air pre-heater | |
July 2003 | Okuma Sdn Bhd | 2100mm O/D X 700MM SL Sterilizer Clutch Door -2 Right Opening and 3 Left Opening | 5 units |
June 2003 | Polysius Engineering Sdn Bhd | To supply & fabrication of platework for codeword SONGIFA KILN | 200 T |
June 2003 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing & Painting, Installation & Commissioning of Service Station F5000 and F3000 Skids Phase 1 ‘02( Change Order 7 nos of Skid) | 2200” dia inch |
May 2003 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing & Painting, Installation & Commissioning of Kulim City Gate Station | 10 T 1200” dia inch |
May 2003 | Transwater API Sdn Bhd | Procurement, Fabrication, Testing & Painting of 32 nos of 3” 300# TARTARINI Dry Gas Filter FA 12/80 | 1200” dia inch |
April 2003 | Malaysia Transformer Manufacturing S/B | To fabricate 30MVA Tank & cover full welding tank & cover with shot blasting for 30MVA 33/11kv 55dB complete with core clamp | 13 units |
April 2003 | Enoch Sdn Bhd | Fabrication and installation of steel roof trusses for project Kolam Renang & Kolam Terjun at Paroi, Seremban |